Parklawn Building Renovation for GSA Tenant

Existing building retrofit: Parklawn Building Renovation for GSA Tenant; GHT Limited

08/09/2012


This image shows 5600 Fishers Lane during its renovation.Project name: Parklawn Building Renovation for GSA Tenant

Location: Rockville, Md.

Firm name: GHT Limited

Project type, building type: Existing building retrofit, office

Project duration: 5 years

Project completion date: Aug. 29, 2014

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $2.5 million

Engineering challenges

The MEP engineering solution addresses many of these challenges. GHT’s design for an upgraded system, which includes revamped chillers and cooling towers, still allows nearly 75% of the existing building equipment in the mechanical penthouse to be reused. Keeping significant portions of the penthouse equipment online during the renovation will reduce disruptions to tenants in the occupied spaces. It also allows the nonrenovated wing to remain operational with its existing system from the shared penthouse. To help maximize ceiling heights, the design team’s mechanical solution is much more compact and requires smaller infrastructure than the legacy system. GHT used Autodesk Revit MEP, BIM software, in collaboration with Gensler to coordinate the tight plenums required to achieve this goal.

Solutions

To deal with these design constraints, the HVAC design utilized a central water system supplying local water-cooled HVAC units, with air cool units serving the public and food courts. Pump staging and VFDs were used to vary water supply to meet the partial load conditions and provide a more energy-efficient system. In order to deal with the backup power requirements and limited space, the generators were located in the underground areas with exhaust and cooling water systems skillfully routed to the roof level and hidden from view. The supply air is routed underground utilizing a ductwork system powered by a set of in-line fans, and the exhaust air is removed via strategically located air shafts hidden from view and powered by dedicated up-blast fans.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
MEP Giants; MEP Annual Report; Mergers and acquisitions; Passive, active fire protection; LED retrofits; HVAC energy efficiency
Integrating electrical and HVAC systems; Tracking and conserving facility water use; Energy code advancements; The future of professional engineers
Control noise, vibration in building design: Tackling acoustics and design issues; High-performance building design; NFPA 99; Combined heat, power
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me