Optimation Technology Inc.: 70-lb Steam Leak Emergency Service Call

Infrastructure service at an industrial/manufacturing facility/warehouse and office building.

08/14/2014


Installing temporary 70-lb steam line underground on Lake Ave. Courtesy: Optimation Technology Inc.Engineering firm: Optimation Technology Inc.
2014 MEP Giants rank: 22
Project: 70-lb Steam Leak Emergency Service Call
Address: Rochester, N.Y., U.S.
Building type: Industrial/manufacturing facility/warehouse, Office building
Project type: Other
Engineering services: Plumbing/piping and other
Project timeline: 2/27/2014 to 4/4/2014
MEP/FP budget: $63,000

Challenges

A local utility company in Rochester, N.Y., is investing millions to increase Eastman Business Park’s energy efficiency and utilities productivity to help attract new businesses and jobs to the region while ensuring compliance with Boiler MACT and other pending environmental regulations. The utility company purchased the park from a local chemical/film company in late 2013 and has been working on infrastructure upgrades since then. The utility company’s operations manager called Optimation’s construction manager, Jack Burke, for an emergency meeting after a 70-lb steam main had fractured beneath Lake Avenue. This line supplied steam to a neighboring company, causing the company to shut down operations. Both the neighboring company and the utility company became concerned about cold weather causing sprinklers to activate and damage operations and research in the neighboring company’s production facility. The objective: fix the steam main and get utilities to the neighboring company up and running ASAP.

Installed temporary steam main. Courtesy: Optimation Technology Inc.Solutions

Optimation had to think out of the box to create a solution that would quickly fix the problem, without requiring cranes and having to wait for an out-of-state contractor. Within a day, Optimation assembled a team of welders, pipefitters, riggers, and an insulation partner to fabricate a series of pipes that would be connected by bolts and gaskets underneath the street, repairing the fractured line. Optimation prefabricated 160 ft of pipe in its shop prior to its arrival at the job site. In another effort to save time at the job site, the construction manager planned to have the pipes insulated in Optimation’s shop space after welding. The pipes were then moved by crane to prevent damage to the insulation and save time for the client on the job site. Picking points were welded onto the pipe to prevent damage to the insulation during mobilization and installation. When in the field, the client contracted an excavation company to dig a 3-ft trench. Optimation needed to tie into the existing mains, custom fabricating transition pieces to connect tie points to Optimation’s prefabricated pipes. Optimation pipefitters redirected the pipes to stay south of the damaged area. The work was completed in 2.5 days, saving the client from weeks of lost time. The client was appreciative of the efforts that Optimation’s skilled tradesmen put in to fix the problem.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me