Open connectivity through open standards began as a way for suppliers to achieve interoperability from factory floor devices to first-tier visualization applications. This is part of a Control Engineering December cover story.

12/07/2010


Open connectivity through open standards, known today as OPC, began in 1995 as a way for suppliers to achieve interoperability from factory floor devices to first-tier visualization applications. Based on Microsoft technology, OPC was a vendor-driven initiative.

“Vendors were tired of developing software to communicate to hardware on the factory floor and having to maintain all the corresponding device drivers,” explained OPC Foundation’s Tom Burke. “The situation aligned with the concept of a printer: printer companies provided corresponding software to allow applications to connect and print documents to the desired printer. In the OPC world, we created a cottage industry in which software companies began to develop software that performed better than that created by the hardware vendors for their respective devices.”

This model continues with OPC Unified Architecture (OPC-UA). “OPCUA,” Burke went on, “separates the data from the services in such a way that the data, and the corresponding metadata behind the data, can now be generically discovered by applications connecting up to devices or other applications, providing timeless durability for systems built today and tomorrow.”

End-user demands for security and reliability continue to drive competitive vendors to work together to develop industry standards such as OPC-UA. Consortiums are also working with the OPC Foundation to develop companion specifications that will plug into OPC-UA for their respective information models. “OPC provides the infrastructure necessary for discovering, querying, subscribing, reading, and writing information of the various consortium modeling activities,” said Burke. “Their suppliers can develop complex applications simply, without needing intimate knowledge of the information models that exist today…or will exist tomorrow.”

A simple example of this concept is the USB (universal serial bus), which has helped shape the consumer electronics world. “Plug a device in to a laptop that supports USB,” Burke explained, “and suddenly you are able to do everything with that device. Industrial automation systems of tomorrow will support the same plug-and-play operation. Applications will be able to discover the devices that are being plugged in and configure, diagnose, and retrieve data from them.”

www.opcfoundation.org

- Jeanine Katzel for Control Engineering, as part of the December 2010 Cover story: Integrating Disparate Control Systems.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.