SEARCH Archives
Loading
Sponsored by:

New Data Center Sustainability Metrics

Green Grid announced the release of two new data center sustainability metrics designed to help improve carbon and water-use effectiveness.

Source: Green Grid

12/07/2010


The Green Grid announced the creation of two new metrics designed to help improve the sustainability of data center facilities by measuring the effectiveness of carbon and water use tied specifically to the IT energy infrastructure they contain.   The new metrics, called Carbon Usage Effectiveness (CUE) and the upcoming Water Usage Effectiveness (WUE), are joining The Green Grid’s Power Usage Effectiveness (PUE) metric. All are designed to help IT, facilities, and sustainability organizations across the globe optimize their data centers.

PUE helps managers determine the efficiency of the IT gear in their data centers by comparing the total amount of energy consumed by the data center facility to the total amount of energy consumed by the IT equipment inside it. PUE was recently established by a cross-industry data center metric task force as the recommended metric for determining energy efficiency in dedicated data center facilities.

CUE will help managers determine the amount of greenhouse gas emissions generated in delivering work from the IT gear in a data center facility. Similarly, WUE will help managers determine the amount of water used by the facility, and the amount used to deliver work from IT operations.

A white paper outlining the new CUE metric, including methods for calculating it, can be found on The Green Grid’s Web site. Materials related to WUE will be made available in the first quarter of 2011. PUE, CUE and WUE will be discussed at length at The Green Grid’s Technical Forum 2011 in March, and interested organizations can become active in The Green Grid by becoming members.

The Green Grid welcomes active participation from the organization’s members and the industry at large on these topics, consistent with its efforts to encourage worldwide industry collaboration on strategic and tactical projects to improve data center efficiency.  Registration to The Green Grid Technical Forum 2011 opens to members and non-members today, and the event will be held on March 1-2 in Santa Clara, CA. Attendance is open to members of The Green Grid on March 1, and then opens to the public and the media on March 2. Topics will include technical content and training in the areas of energy efficiency and sustainability, including PUE, CUE and WUE metrics.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.