SEARCH Archives
Loading
Sponsored by:

Modular industrial patch panel

Belden's modular industrial patch panel (MIPP) is a termination panel for cables that need to be connected to active equipment with Ethernet connections and serve as a bridge between between Belden cables and Hirschmann switches.

02/09/2012


Belden's modular industrial patch panel (MIPP) is a termination panel for cables that need to be connected to active equipment with Ethernet connections and serve as a bridge between between Belden cables and Hirschmann switches. Courtesy: BeldenBelden Inc. (NYSE:BDC), has added a modular industrial patch panel (MIPP) to its Belden and Hirschmann product series. The new MIPP is a termination panel for cables that need to be connected to active equipment such as switches, Industrial Ethernet devices and any other device with an Ethernet link. The MIPP offers greater system reliability and ease of installation and provides the ideal connection between Belden cables and Hirschmann switches. 

Using patchcords to connect to active equipment, cables can be terminated outside the cabinet in an organized and structured manner to ensure the highest level of reliability. Installation is quick and easy, saving time and significantly reducing initial set-up costs. At the same time, the MIPP contributes to greater reliability with easier and more efficient system management that requires less maintenance. With a lightweight aluminum structure that increases its overall versatility, the MIPP easily mounts on a DIN Rail or on the sides of cabinets using a wall mount plate. The small housing, high port density and modularity keep cabinet space to a minimum.

The MIPP was designed for industrial use, where its functionality and reliability can make a significant contribution to the uptime and availability of systems. It is ideal for use in a wide range of industrial applications requiring maximum system reliability and flexibility. The industrial design makes it highly suited for use in machine building, transportation, alternative power generation, power transportation and distribution and oil and gas markets, as well as for general use in commercial buildings and other applications.

For the first time, MIPP’s modular design and compact dimensions allow up to six individual modules to be combined in any permutation to create a large single patch panel where fiber and copper cables can be connected at the same time. When required, each module is easily removed or replaced for maximum system flexibility.

The MIPP is available as both single and double modules.

Single modules

  • 6 x SC duplex adapters (up to 12 fiber connections)
  • 6 x LC duplex adapters (up to 12 fiber connections)
  • 4 x RJ45 keystone jacks

Double modules

  • 12 x SC duplex adapters (up to 24 fiber connections)
  • 12 x LC duplex adapters (up to 24 fiber connections)

Belden Inc.

www.belden.com 

- Edited by Chris Vavra, Control Engineering, www.controleng.com

controleng.com/networks



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.