In a two-part series, the importance of effective mechanical, electrical, plumbing, and fire protection systems design for magnetic resonance imaging suites is examined. Part two focuses on the electrical, fire protection, and plumbing considerations when designing MRI suites.

02/13/2017


In a two-part series, the importance of effective mechanical, electrical, plumbing, and fire protection systems design for magnetic resonance imaging suites is examined. Courtesy: Joel FilipeWithin a hospital, needs vary significantly by department and specialty treatment area, a MEP firm needs to understand each area's unique specifications and requirements involving mechanical, electrical, plumbing, and fire protection (MEP/FP) systems.

Electrical systems

MRI equipment must be protected from electrical interference that can upset the magnetic field and the imaging process. Keeping equipment running is critical, and the RTM team knows that the heart of a safe and reliable facility is the primary and secondary power supply [VS1] systems with proper distribution channels.

Lighting

An MRI scanner produces a radio frequency (RF) signal that must be protected from interference. Alternating current (ac) power has been known to result in RF interference and distortion of images. Because of this, MRI room-lighting fixtures use direct current (dc) power. As in every hospital setting, lighting levels should be carefully reviewed; RTM uses in-house lighting designers to run photometric calculations to assure proper light levels.

RF shield

RF shields are typically thin sheets of copper foil, aluminum, or galvanized steel that cover floors, ceilings, doors, and windows in an MRI magnet room. Any penetrations into RF-shielded areas (HVAC, power, exhaust, plumbing, and piping) pass through RF filters or wave guides. Since ferromagnetic materials can interfere with MRI operations, all ductwork, hangers, and supports within the RF shield must be nonferrous.

Emergency power and UPS

Individual hospitals, along with the building code, determine the type of emergency power MRI equipment will need in the event of a power outage. Hospitals frequently use uninterrupted power supply (UPS) systems to maintain constant power to equipment during an outage or when transferring from one source to another. The UPS helps maintain power when switching to and from generator-backed power.

Plumbing and fire protection systems

MRI suites require unique plumbing and fire protection systems to meet the facility's health and safety needs while also accommodating the equipment's distinct specifications.

Plumbing

Designing plumbing systems around an MRI magnet room without interfering with sensitive equipment is particularly challenging. Water and drain lines must be installed in a way that will not interfere with the RF shield including passing through RF wave guides and dielectric breaks.

Fire protection

All sprinkler system components in MRI rooms must be constructed of nonferrous materials (copper, brass, and stainless steel are common). Careful consideration should be made for piping in adjacent spaces.


-This article originally appeared on the RTM Engineering Consultants blog. RTM Engineering Consultants is a CFE Media content partner.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 Under 40; Performance-based design; Clean agent fire suppression; NFPA 92; Future of commissioning; Successful project management principles
BIM coordination; MEP projects; NFPA 13; Data center Q&A; Networked lighting controls; 2017 Product of the Year finalists
Emergency lighting; NFPA 3 and 4; Integrated building systems; Smart lighting, HVAC design
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me