Maricopa County, New High-Rise Court Tower

New construction: Maricopa County, New High-Rise Court Tower; Syska Hennessy Group Inc.

Source: Syska Hennessy Group Inc.

08/09/2012


Exterior shot of the new Maricopa County CourthouseProject name: Maricopa County, New High-Rise Court Tower

Location: Phoenix, Ariz.

Firm name: Syska Hennessy Group Inc.

Project type, building type: New construction, office

Project duration: 4.3 years

Project completion date: Feb. 20, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $4 million

Engineering challenges

The court tower requires systems capable of supporting high-tech security and office equipment, while remaining flexible to support programmatic changes necessary to complete the master plan and future expansions. Also, the architectural geometric model was used as a basis for the design of mechanical, electrical, and plumbing systems; airflow, temperature, and pressure simulations (CFD modeling); and energy analysis.  

Solutions

As a part of the design team, Syska is contributing to the development of a 3-D model in an integrated BIM environment using Revit MEP Suite 2009 software. Using Revit and Navisworks for cross-disciplinary integration enables the design team to immediately see the effects of design changes, verify equipment clash and interference, and communicate more effectively. The model also allows the Syska design team to validate static pressure duct and system information, airflow (cfm), obtain quantity take-offs, and incorporate "smart tags" to support commissioning efforts. Syska also utilized the architectural 3-D Revit model to develop the energy model. GreenBuilding Studios takes the geometrics from Revit and transfers them directly to Equest. Beginning the process in Revit saved the design team substantial time and energy. CFD models using AirPak were also developed for the main courtroom and Sallyport. Syska utilized CFD modeling to evaluate end-user thermal comfort within all areas of the courtroom and ensure a consistent temperature gradient throughout the entire space. The Sallyport was also modeled to evaluate airflow to ensure effective collection and removal of vehicle exhaust.

Exterior night shot of the courthouse entranceInterior shot of the courtroomImage of the mechanical room equipmentShot of the electrical room equipment



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.