Manufacturer focus: Designing labs, research buildings

05/28/2013


CSE: What unique fire, life safety, or security issues have you tackled? Describe the project.

Schneider Electric: The biggest challenges have been integrating security as well as fire and life safety in our current Biosafety Level 4 projects. The amount of redundancy and reliability built-in is 10 times more complex than a BSL-3 or BSL-2 project.

CSE: Describe a recent college or university teaching lab project. What were the challenges and solutions?

Schneider Electric: The biggest challenges have been integrating security as well as fire and life safety in our current Biosafety Level 4 projects. The amount of redundancy and reliability built-in is ten times more complex than a BSL-3 or BSL-2 project.

CSE: What building envelope challenges have you tackled in a recent lab or research facility? Define the problem and solution.

Schneider Electric: The biggest challenges in every area are on our BSL-4 lab buildings. Leakage and building envelope issues go hand in hand. As building automation providers, we must work closely with technically versed architects, engineers and commissioning agents work to execute these immensely complex projects.

CSE: When working in labs, what types of projects have been driven by new requirements in ASHRAE Standard 62.1, Ventilation for Acceptable Indoor Air Quality? What challenging projects have you worked on?

Daikin McQuay: Standard 62.1 has considerable influence on lab projects due to the increased need for energy efficiency and the design challenges of ventilation in lab design. Any lab project with Class 2, 3, or 4 air streams will need to carefully review the requirements of 62.1 for the potential of heat recovery.

CSE: Describe a unique fume hood project—describe the goals, challenges, and your product’s success. 

Schneider Electric: We are currently studying a pharmaceutical building with fume hoods for an energy upgrade. The project team is considering fume hood interior retrofits. In an ideal installation, the aerodynamics of each fume hood is improved such that safety is improved even as the energy use is reduced. The usual goal is to drop the minimum inflow velocity from 100 fpm to 60 fpm.

CSE: When working in facilities that have BSL-3 and BSL-4 containment, what unique systems or products do you provide? Describe a recent BSL facility. 

Schneider Electric: We are currently in design and construction on multiple BSL-4 facilities in the U.S. and overseas. Like race cars help companies design the family car, designing BSL-4 labs help us in designing BSL-3 and BSL-2 labs. One of the results of doing such complex buildings as BSL-4 is Schneider Electric's TVDA approach. Ten years ago, many third-party systems like fire and life safety where integrated in the field for each building. The current approach of TVDA is to test, validate, and document each architecture in the test lab prior to installation in the field. This has led to quicker installation with higher quality and lower cost. This especially applies to integrating systems from third party providers into an overall building automation framework.


<< First < Previous 1 2 3 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.