Power Where it Matters I was just reading your Sept. Editor's Viewpoint about the blackout and where, in our society, uninterruptible power sources are prioritized (TV). Watching the coverage that night, my wife and I were struck, like you, that things like hospitals, water supplies and subways were crippled, yet we still had endless TV coverage with chattering anchormen.

10/01/2003


Power Where it Matters

I was just reading your Sept. Editor's Viewpoint about the blackout and where, in our society, uninterruptible power sources are prioritized (TV). Watching the coverage that night, my wife and I were struck, like you, that things like hospitals, water supplies and subways were crippled, yet we still had endless TV coverage with chattering anchormen.

But we both chuckled, when after hearing about dark hospitals, stuck elevators, spoiling food, unfunctioning plumbing and other dire inconveniences, a local news guy said, "If you find yourself in real trouble due to heat or dehydration, go to a mall. They will have power."

The grid may have collapsed, but when the going gets tough, go shopping.

Randy Amborn, Trane, St. Paul

Consider Climate

Alan Levitt's findings for diesel power plants—"Overlooked Essentials" ( CSE 09/03 p. 9)—may be typical for his area but not for ours.

Per his first consideration: It is not cost-effective to provide a generator for fuel pumps. We normally place the generator on a sub-base tank with the engine fuel pump piped directly to the tank on single generator installations. On multiple generator installations or where a sub-base tank can't be used, a day tank is installed in the generator skid and connected directly to the engine fuel pump. The day tank provides at least two hours of fuel at full load. It is monitored by a level control which starts remote pumps connected to generator power. The level is set to maintain day tanks at no less than half-full.

Per his second consideration: Gauges should definitely be checked. We always specify an annunciator with fuel level and fuel leak alarms. Setpoint is checked as part of annunciator commissioning. Whether base tanks or remote tanks, the level is set to allow the owner sufficient reserve to secure fuel, dependent on individual circumstances. A routine check of invoices against alarm point should indicate drift. The dipstick can then be used for confirmation.

Per his third consideration: One of the leading causes of a generator failing to start is lack of maintenance and regular exercising. It is false economy to turn off the exerciser clock, but I have seen it done. Actual exerciser controlled startup should be monitored and logged. We always recommend that our customers with limited staff secure a maintenance agreement with the manufacturer.

I believe that we need accurate and complete recommendations on design and installation of generators in the different climates and conditions around the country. I would be most interested in how other parts of the country handle details like the above issues.

W. M. Luffey, P.E., DeSoto County Electric, Inc., Horn Lake, MISS.





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me