Important NEC exclusion In your Codes and Standards story "New NEC Could Change Emergency Power Distribution System Design" (CSE 8/05, p.21), you neglected to mention a section 700 paragraph that is certain to have a significant impact on the design of emergency feeders. 700.9(D)(1), for buildings that exceed 75 ft.

11/01/2005


Important NEC exclusion

In your Codes and Standards story "New NEC Could Change Emergency Power Distribution System Design" ( CSE 8/05, p.21 ), you neglected to mention a section 700 paragraph that is certain to have a significant impact on the design of emergency feeders.

700.9(D)(1), for buildings that exceed 75 ft. in height and places of assembly of 1,000 persons or more, requires that emergency feeders be in spaces or areas that are protected by an approved automatic fire suppression system. Comments in the handbook distinguish this change from 2002: Previously, it required wiring to be in buildings that were fully protected by an approved automatic fire suppression system. However, such buildings may have spaces, such as a space above a suspended ceiling, that are not fully protected by the suppression system. The revised wording clarifies that the wiring must be in a space that is protected by the automatic suppression system .

BARRY O'CONNELL P.ENG., TYCO THERMAL CONTROLS





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me