Learning objective: Designing K-12 schools

In K-12 schools, technological advancements, code requirements, and other demands placed on engineers are consistently increasing, while limitations like budget restraints remain a challenge.

03/26/2015


Respondents

  • David Ellis, PE, CEM, LEED AP Senior Vice President of Engineering Allen & Shariff Engineering LLC Columbia, Md.
  • Nestor Ortiz Senior Construction Engineer, Project Officer Parsons Brinckerhoff Long Island City, N.Y.
  • John C. Palasz, PE, HFDP Mechanical Engineer Primera Engineers Ltd. Chicago


CSE: Please describe a recent K-12 school project you've worked on.

David Ellis: I was involved with the design of a complete renovation of a 330,000-sq-ft high school located in Washington, D.C. This project included a natatorium, performance auditorium, arts center, gymnasium, two kitchens, and academic classrooms, including labs. The high-performance conditioning and ventilation system for this school involved the matching of a hydronic variable refrigerant flow (VRF) system, using a ground coupled approach along with a dedicated outdoor air system (DOAS). Design was performed using a design assist contract, which included a great deal of cost control input from the contractor, as this allowed for an accelerated construction schedule while containing costs. As this was a renovation, BIM software proved valuable for coordination.

Nestor Ortiz: I am the lead project officer for the school construction authority (SCA) construction management for an expansion/renovation of a public school in Queens,N.Y. We are adding 43,000 sq ft to an existing school. The new building will have four floors and a mechanical equipment room located on the roof. This expansion will be connected to the existing school at all three floor and cellar levels. The school will become Americans With Disabilities Act (ADA) compliant as well as provide two elevators, a gymatorium, a new kitchen/cafeteria, eight new classrooms, a music room,a library, a science resource room, and an art room. In case of emergency, the school will be able to run on emergency backup due to its new generator located at the roof level.

Primera Engineers was engaged to renovate the boiler at Chicago’s Carl Schurz High School, a historic landmark. The team replaced steam boilers with 500-hp, low-pressure steam boilers, added steam-to-water heat exchangers, two 365-ton centrifugal chillers

John C. Palasz: I was the lead mechanical engineer for a boiler renovation project at Carl Schurz High School. A historic landmark on Chicago's northwest side, Schurz is a 400,000-sq-ft building housing more than 2,500 students. The project included the replacement of the steam boilers with new 500-hp low-pressure steam boilers with the addition of steam-to-water heat exchangers, two 365-ton centrifugal chillers and cooling towers, as well as all pumps, feed water, chemical treatment, and accessories to provide a dual-temperature water plant. In addition, the air-handling systems were refurbished and retrofitted with new dual-temperature coils, fan motors, filters, and dampers. The project also included all associated controls and a new building automation system (BAS).

CSE: How have the characteristics of K-12 school projects changed in recent years, and what should engineers expect to see in the near future?

Ortiz: There are several safety features that have been added to schools for security reasons, such as cameras throughout the school grounds and designated rescue rooms. Aside from security upgrades, the engineers can expect mechanical, electrical,plumbing (MEP), and fire protection systems that are more self-sufficient and efficient.They will make the school custodian's life easier as the equipment will be able to communicate if there is an issue or service needed. The equipment will be able to run efficiently, in various modes, such as startup, occupied, unoccupied, and economizer mode.

Palasz: Similar to a number of other markets, K-12 school projects have started to see more demanding design and construction schedules in recent years. Schools and districts are stretching their budgets in multiple directions to cover necessary building repairs, infrastructure upgrades to reduce energy costs, teacher salaries and pensions,utilities, and the desire for improved teaching technologies such as smartboards and computers. As budgets stay the same or decrease and schedules decrease, these projects become a challenge. In the near future, engineers can expect to see an increase in the overall number of projects as aging buildings and rising energy costs drive the need for building control systems and high-efficiency design. The energy codes (International Energy Conservation Code and ASHRAE Standard 90.1) raise the bar for both renovation and new construction projects, but this usually comes with a higher price tag. Furthermore, the long-term energy savings that are designed may not be realized. Commissioning the system after the initial setup as well as regularly scheduled user training can help to achieve or maintain the projected energy savings.

Ellis: Sustainability-in regard to energy-water, and acoustics have taken charge of the design approach. The U.S. Green Building Council's LEED for Schools program has led to innovation in school design, where measures such as energy-efficient design,water conservation, and a focus on room acoustical performance has improved classroom effectiveness while improving the sustainability of the school project. As certification programs ratchet up performance expectations, along with higher performance sustainability codes, expect the drive to net zero to enter into the next generation of facilities that begin design within 5 to 10 years.

CSE: How does engineering systems in K-12 schools differ from colleges and universities?

Palasz: My experience is that college and university engineering systems are generally designed to encourage student enrollment. Expenses are seldom spared to ensure quiet and comfortable designs while systems are designed with a higher standard of quality. These systems can be designed to last 100 years or more. Additionally,classrooms are designed with more versatility to specifically allow for rapid furniture changes to allow for collaboration one day and independent work the next day. On the contrary, many K-12 projects are limited by budget, and improvements are made to bring the school up to par or code minimums. Budget constraints often limit the design approach, which results in equipment that is expected to last between 20 and 30 years.

Ellis: There are similarities, of course, but in general, along with the discrete focus buildings, as opposed to the combined activities in schools, universities have the potential for campus-wide utilities and the hours of operation tend to be extended. In addition, university operations staff typically have a higher level of training than the staff of K-12 schools.

Ortiz: My work experience has allowed me to work with many types of buildings, but not colleges/universities. 


<< First < Previous 1 2 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me