IR windows to prevent arc flash incidents

The Fluke ClirVu CV Series IR Windows are designed to prevent arc flash incidents and are torture tested to the highest arc blast test ratings.

02/12/2014


The Fluke ClirVu CV Series IR Windows are designed to prevent arc flash incidents and are torture tested to the highest arc blast test ratings. Courtesy: FlukeThe Fluke ClirVu CV Series IR Windows are designed to prevent arc flash incidents by eliminating the need to open the panel door to take infrared camera readings. The ClirVu CV Series offers the ultimate protection for the electricians, engineers, and inspectors who work around high-energy equipment. They are Torture Tested to the highest arc blast test ratings and, when properly installed, maintain a panel arc test rating of up to 63 kA. Once installed, there's no need to power down or remove panels—inspections can be conducted quickly, easily, and safely. Installation takes one technician 5 minutes or less. Simply lockout-tagout, punch one hole with a standard conduit punch without removing the panel door, attach, and secure the cover. The AutoGround feature grounds the IR window to the metal enclosure, eliminating the need to separately ground each metal component of the window. 

Fluke Corp. 

www.fluke.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Control noise, vibration in building design: Tackling acoustics and design issues; High-performance building design; NFPA 99; Combined heat, power
40 Under 40; Stand-alone medical buildings; NFPA 92; Specialty fire suppression; Applying 90.1 in lighting design
2016 Product of the Year Finalists: Vote now; Data center Q&A; LED codes; Smart buildings
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me