Indoor Air Quality Guide: Best Practices for Design, Construction, and Commissioning

The review period for this draft is open until Aug. 19, 2008.


The final result of a three-year project will be the Indoor Air Quality Guide: Best Practices for Design, Construction, and Commissioning for commercial and institutional buildings along with an educational outreach effort including a Satellite Broadcast and a Professional Development Seminar (PDS). While the PDS will be developed after publication of the guide, the satellite broadcast is being planned for spring 2009.

The guidance document will assist building professionals in their efforts to improve indoor air quality (IAQ) by providing practical guidance on best practices for IAQ in all phases of building design and construction including those that affect operation and maintenance. The finished guide is expected to include an overview document with an accompanying CD containing more detailed guidance and information.

The review period for the 90% draft of the Indoor Air Quality Guide: Best Practices for Design, Construction, and Commissioning has been changed. The review period ends Tuesday, Aug. 19 , 2008.

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
MEP Giants; MEP Annual Report; Mergers and acquisitions; Passive, active fire protection; LED retrofits; HVAC energy efficiency
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.