SEARCH Archives
Loading
Sponsored by:

Hybrid surge protective device has multi-stage system of suppression

The Liebert SH Hybrid Series Surge Protective Device offers a coordinated multi-stage system of supporession and integrates the fast response time of the Silicone Avalanche Diode with the high-energy capability of the standard Liebert SI Series Metal Oxide Varistor.

01/03/2011


Emerson Network Power, a business of Emerson, has announced its launch of the Liebert SH Hybrid Series Surge Protective Device. This is the first hybrid product in the industry to offer a true, coordinated multi-stage system of suppression, according to Emerson.

The Liebert SH Hybrid Series, available globally, integrates the fast response time of the Silicone Avalanche Diode (SAD) with the high-energy capability of the standard Liebert SI Series (Interceptor) MOV (Metal Oxide Varistor).

“This new series offers the highest surge current capability and survivability in the industry,” said Sarah Beadle, director of marketing, for the Surge Protection business of Emerson Network Power.  “We’re also the only surge manufacturer with a built-in test circuit that monitors MOV/fuse link status.”

The Series offers patented component level monitoring, including neutral to ground. It also delivers a unique sand-packed silver fuse network that’s UL Rated at 200kAIC for maximum safety. All of the product’s surge suppression components are computer-tested and matched for optimum reliability and long life.

Most “hybrid” products are grouped into two basic categories: self-sacrificing or oversized. Self-sacrificing systems significantly degrade or fail with nominal fluctuations or high-energy events, which is extremely inconvenient to customers, and leaves room for critical load upsets/failures. Oversized components allow the system to deal with the nominal line voltage – as a result, clamping levels increase, defeating what it is designed to do.

The Liebert approach is the Transitional Method, which involves a closely regulated amount of energy that is transitioned between the primary SAD module and the secondary MOV module. This primary/secondary hybrid design takes advantage of the tight clamping and rapid response characteristics of the SAD – while incorporating the high-energy handling characteristics of the MOV module.

www.EmersonNetworkPower.com

Emerson Network Power

www.Emerson.com

Emerson

- Edited by Amanda McLeman, Control Engineering, www.controleng.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.