HVAC, BAS in office buildings

Seven in 10 of engineers are responsible for determining requirements/writing specifications, researching and evaluating options, and/or supervising or consulting on these projects.

09/28/2016


Figure 2: The top technologies that engineers expect to see an increase of within office building projects are energy recovery (71%), demand-controlled ventilation (61%), and dedicated outdoor air systems (58%). Courtesy: Consulting-Specifying EngineerThree-quarters of respondents to the Consulting-Specifying Engineer 2015 HVAC and Building Automation Systems (BAS) Study specify, design, or make product selections for office buildings—and seven in 10 of these engineers are responsible for determining requirements/writing specifications, researching and evaluating options, and/or supervising or consulting on these projects. Below are five HVAC and BAS findings as they relate to office building projects:

  1. Annual specified products value: The average engineering firm specifies $2.72 million in total HVAC and building automation/control products for new and existing office buildings on a yearly basis, with one-third of these firms specifying more than $5 million.
  2. Future of HVAC systems, BAS: An inadequate budget for good design is the top issue affecting the future of HVAC system and BAS design in office buildings. In addition, HVAC system design is challenged with designing for energy efficiency, while designing BAS for interoperability and complementing systems also impacts future projects.
  3. Products specified: Seven in 10 engineering firms are specifying fans and air movement, air handlers, and rooftop units for office building projects. Over the next 12 to 24 months, firms have plans to specify variable refrigerant flow systems (32%), chillers and chilled-water systems (26%), and BAS (22%).

  4. Important product considerations:
    When selecting HVAC products for office buildings, engineers compare product quality (85%), energy efficiency of a product (62%), and service support offerings (59%).
  5. HVAC, BAS specifications: Engineering firms most often write performance (81%), prescriptive (73%), or open (alternate or substitute; 65%) HVAC and controls specifications for office building projects.

View more information at www.csemag.com/2015HVACBAS. Amanda Pelliccione is the research director at CFE Media.


Figure 1: The average fire protection engineer spends 62% of time on billable hours for projects they are involved in. Courtesy: Consulting-Specifying Engineer 2016 Fire and Life Safety Study

9 in 10 engineers agree that product quality, technical advantage, service support, and a manufacturer's reputation are important when comparing electrical/power systems. Source: Consulting-Specifying Engineer 2016 Electrical and Power Study

71% of engineers' lighting specifications have been affected by recent changes to industry codes and standards. Source: Consulting-Specifying Engineer 2015 Lighting and Lighting Controls Study

$1.3 million: Average dedicated outdoor air system project size. Source: Consulting-Specifying Engineer 2015 HVAC and Building Automation Systems Study

More research

Consulting-Specifying Engineer covers several research topics each year. All reports are available at www.csemag.com/research.



Anonymous , 10/04/16 11:29 AM:

"Even in 10 of engineers..."? I think the title should be "Seven in 10..."
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me