Hoffman receives Award of Merit for high school design

Hoffman LLC, Appleton,Wis., received the Award of Merit at the Fourth Annual Wisconsin Sustainability & Energy Efficient Leadership Awards Conference for its design and construction of the Northland Pines High School in Eagle River, Wis.

09/26/2007


Hoffman LLC, Appleton, Wis., received the Award of Merit at the Fourth Annual Wisconsin Sustainability & Energy Efficient Leadership Awards Conference for its design and construction of the Northland Pines High School in Eagle River, Wis.

The Wisconsin Green Building Alliance and the U.S. Green Building Council coordinated the conference. The Northland Pines High School project earned the nation’s first LEED environmental gold rating for a public high school in the United States. In addition. Northland Pines is the highest-rated LEED-certified high school in the country. It also is the first LEED-certified K-12 school building in Wisconsin.

The $28.8 million, 253,000-sq- ft. high school serves as many as 600 students. It features an atrium central commons area, naturally lit classrooms, clean air monitoring and water-saving dual flush toilets and no-water urinals.





Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Boiler basics; 2017 Product of the Year winners; Manufacturing facilities Q&A; Building integration; Piping and pumping systems
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me