High-efficiency rooftop units

Lennox has added 7.5- to 10-ton gas/electric and electric/electric rooftop units that feature an isolated compressor and a slide-out blower for more efficient operations.

02/19/2013


Lennox has added high-efficiency 7.5- to 10-ton, gas/electric and electric/electric models to its existing line of Landmark rooftop units. This factory-installed technology uses a variable frequency drive (VFD) to deliver supply fan power savings of up to 61% while still meeting comfort requirements. Additionally, high-efficiency Landmark models may help businesses qualify for state and local utility rebates. The Landmark unit’s flexible design offers more than 100 field customizable options and more than 30 features designed to reduce installation and service time. This includes an isolated compressor compartment for easier, more accurate charge confirmation; a slide-out blower that offers quick belt tensioning, adjustment, or replacement and easier cleaning of the blower wheel; and an accessible gas compartment that simplifies analysis and service.

Lennox

www.lennox.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.