H.D. Woodson opening ceremonyProject name: H.D. Woodson High School

Location: Washington, D.C.

Firm name: Setty Group

Project type, building type: New construction, school

Project duration: 3 years

Project completion date: Aug. 17, 2011

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $12 million

Engineering challenges

H.D. Woodson High School holds the distinction of being the first newly constructed Washington, D.C., high school in nearly 40 years. With this merit came the challenge to not only comply with all requirements of the local constituency but also to bring forth a conscious effort in establishing the benchmark for all future Washington, D.C., schools and surpass the minimum requirements of local energy code, ASHRAE, and U.S. Green Building Council LEED. Some of the challenges included a below-grade main mechanical room and conditioning a natatorium and a large state-of-the-art auditorium while maintaining the high efficiency goals for a project targeting a LEED gold certification. Despite its challenges, the project came in on time and under budget, which is an incredible testament to the entire design and construction team given the project’s sheer size and lofty goals.

H.D. Woodson auditoriumSolutions

Pool dehumidification units were used on the project to condition the large open natatorium space. In keeping with the effort to design above the minimum requirements, and therefore reduce the load on the pool water heaters, waste heat off of the coils of the pool dehumidification unites was hydronically transferred over to the pool water via a heat exchanger. The amount of outside air was also exceeded via an airside economizer cycle to condition the space when ambient conditions were conducive to reduce the mechanical refrigeration requirements for the space. High-efficiency chillers and condensing hot water boilers were used to further improve the energy savings. All dedicated outside air units were also specified with integrated energy recovery wheels, and an automated building automation system was installed to serve all of the equipment in the building. In the state-of-the-art auditorium, architectural floating acoustic clouds for sound baffling were suspended, thereby requiring resizing of all ductwork in intricate detail in order to fit and route it through the webbings of the truss system to meet all of the distribution requirements. All of the ductwork and major piping was modeled and checked for clash detection on a computer before any installation in the field, which allowed for a relatively smoother construction process.

H.D. Woodson basketball courtsH.D. Woodson swimming pool

H.D. Woodson Revit image for its MEP systems



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.