Generator sizing examples

When designing generator systems, such as engine-driven generator sets, design engineers must ensure that the generator selection, sizing, and the design of electrical systems are appropriate for the application.

03/14/2016


Consider the task of sizing a 277/480 V, 3-phase generator for three different loading and motor-starting methods. All three examples use the following loads:

  • One 150-hp motor, Code F, 95% running efficiency, 0.26 starting PF, and 0.86 running PF
  • One 200-hp motor, Code G, 95.4% running efficiency, 0.24 starting PF, and 0.87 running PF
  • Miscellaneous loads of 75 kVA, 0.84 starting PF, and 0.91 running PF.

Motor load: The following equations are used to calculate SkVA, SkW, RkVA, and RkW:

SkVA = motor hp x locked-rotor kVA/hp

Where locked-rotor, Code F motor = 5.5 kVA/hp; Code G motor = 6 kVA/hp per NEC, Table 430.7(B)

SkW = SkVA x starting motor PF

RkW = motor hp x 0.746-kW/hp/efficiency

RkVA = RkW/running motor PF

Miscellaneous load: The following equations are used to calculate SkW and RkW:

SkW = SkVA x starting PF

RkW = RkVA x starting PF

Where load kVA remains constant: kVA = SkVA = RkVA

When designing generator systems, such as engine-driven generator sets, design engineers must ensure that the generator selection, sizing, and the design of electrical systems are appropriate for the application. Courtesy: Stanley Consultants

Example 1: A 1,000-kW generator with 2,525 SkVA at 20% voltage dip is selected from the manufacturer's specification sheet to supply a total load of 2,100 SkVA. The total load of 342 RkW is 34% of the 1,000-kW generator rating. The generator is under-loaded in the final running condition because of the required oversized generator capacity to meet the starting kVA.

Example 1: A 1,000-kW generator with 2,525 SkVA at 20% voltage dip is selected from the manufacturer’s specification sheet to supply a total load of 2,100 SkVA. Courtesy: Stanley Consultants

Example 2: An 800-kW generator with 2,000 SkVA at 20% voltage dip is selected from the manufacturer's specification sheet to supply a total load of 1,412 SkVA. The total load of 342 RkW is 43% of the 800-kW generator rating. The generator is under-loaded in the final running condition because of the required oversized generator capacity to meet the starting kVA. When loads were stagger-started (step-loading), the generator SkVA was reduced from the SkVA required in the example of starting all loads concurrently.

Example 2: An 800-kW generator with 2,000 SkVA at 20% voltage dip is selected from the manufacturer’s specification sheet to supply a total load of 1,412 SkVA. Courtesy: Stanley Consultants

 

 

Example 3: A 400-kW generator with 765 SkVA at 20% voltage dip is selected from the manufacturer's specification sheet to supply a total load of 710 SkVA. The total load of 342 RkW is 86% of the 400-kW generator rating. The generator is loaded to around 86% of its rating in the final running condition, assuming transients are acceptable. When loads were stagger-started and reduced voltage was used to start motor loads, the required generator SkVA was significantly reduced.

Example 3: A 400-kW generator with 765 SkVA at 20% voltage dip is selected from the manufacturer’s specification sheet to supply a total load of 710 SkVA. Courtesy: Stanley Consultants

 

 

When designing generator systems, such as engine-driven generator sets, design engineers must ensure that the generator selection, sizing, and the design of electrical systems are appropriate for the application. Courtesy: Stanley Consultants


ABOUT THE AUTHOR

Tarek Tousson is senior electrical engineer at Stanley Consultants. His expertise is motors, generators, and UPS systems, and he has 20 years of experience designing electrical power distribution systems for mission critical facilities and other types of buildings.


References 

NFPA 20: Installation of Stationary Pumps for Fire Protection

NFPA 70: National Electrical Code

NFPA 99: Health Care Facilities Code

NFPA 101: Life Safety Code

NFPA 110: Standard for Emergency and Standby Power Systems covers



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me