FOE Report Addresses Transmission Problems

Soon after the U.S. Senate passed the Energy Policy Act of 2002, the U.S. Department of Energy (DOE) released its own assessment and recommendations regarding the U.S. electricity-transmission system. The report, the "National Transmission Grid Study," also supports mandatory federal reliability standards, along with new investment in transmission facilities and increased reliance on distribute...

09/01/2002


Soon after the U.S. Senate passed the Energy Policy Act of 2002, the U.S. Department of Energy (DOE) released its own assessment and recommendations regarding the U.S. electricity-transmission system. The report, the "National Transmission Grid Study," also supports mandatory federal reliability standards, along with new investment in transmission facilities and increased reliance on distributed generation, among other recommendations.

Specifically, the study calls for the DOE to assess the nation's electricity system every two years in a public process designed to identify bottlenecks in the grid that have national impact. Additionally, the report says the Federal Energy Regulatory Commission (FERC) should be granted limited authority to site new transmission facilities in bottlenecked areas where the need for a new transmission authority is not being addressed.

Regional transmission organizations (RTOs) will play an important part in eliminating bottlenecks, the report argues. These groups are close enough to the ground to understand localized transmission problems, and should have the relationships necessary with state and local officials to develop appropriate plans. However, new transmission lines may not be the only option. With their understanding of local issues, RTOs may suggest placing new generating facilities closer to large power consumers or encourage incentives for distributed-generation alternatives, the report states.

Public participation earlier in the planning process is essential, according to the report. Currently, public opinion is often sought after transmission-facility siting has begun. As a result, alternative approaches are introduced during these belated public discussions. The time required to study the implications of these new options can prolong debate and delay construction, but by bringing the public into these conversations earlier, cooperation could be enhanced.

From Pure Power, Fall 2002





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me