Fire protection system

Marioff’s HI-FOG is an advanced fire protection system that can be used for commercial and public buildings.

10/04/2011


Marioff’s HI-FOG is an advanced fire protection system that can be used for commercial and public buildings and is being tested for the North American commercial building sector. The sprinkler pump unit (SPU-6) passed a seismic qualifying test after the 7,500-pound machine was able to withstand the effects of an earthquake. The system also has low water and space requirements, making it adaptable while it controls, suppresses, or extinguishes fires by discharging a fine water mist at high velocity. Water mist also provides an efficient water curtain, which blocks the radiant heat, preventing the fire from spreading or reigniting. Smoke particles also bind with the droplets, preventing the smoke from spreading. HI-FOG uses three mechanisms to fight fire: cooling, radiant heat blocking, and local oxygen inerting. Traditional sprinkler systems use wetting as their main mechanism, and therefore use very large amounts of water. The HI-FOG is also easy to use and its configuration is flexible.

www.marioff.com 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.