Feedback: Balkanization of instrumentation and control profession

Stephen Curyk provides further insight on specialists, engineers, and experts, as they relate to control architecture.

10/06/2010


Dennis Brandl’s article “IT and Engineering Insight: Control architecture, who needs it?" highlights the troubling symptom of balkanization in the Instrumentation and Control Profession. Instead of having a team of Instrument and Control Engineers on a project, we now have a gaggle of specialists both inside and outside a project. There are specialists for safety systems, control valves, flow instruments, level instruments, and other field instruments. These specialists may be the engineering companies engineers, the client personnel, vendor personnel, who may or may not be engineers, specialty company personnel, such as DCS experts or PLC programmers, analyzer experts, from the engineering company or the vendor and other, so called, experts.

All of these people have to be able to communicate with, not only each other but also with process engineers and other disciplines. In addition many of these specialists show little ownership of the project. They expect process data and if the data is faulty, have little or no reason to point the anomaly to a process engineer or project manager from a different company. In addition they may be reluctant to point out a possible mistake or a point of confusion to, what they consider, a client.

In addition, each specialty group becomes a fief unto itself and resents any interference by any other specialty group. Errors and mistakes are always the other specialists, the process group or another discipline’s fault. Is it any wonder that a vendor seeing an opportunity, in this confusion, to create another profit center springs on it and invents a new discipline – control architect.

I am put in mind of an old instrumentation joke that if a control system had enough old fashioned relays, the control system would never work because one of the relays would always be failing. In a like manner, if we continue to create new instrument specialists we will get to a point where no projects will ever be free of unsolved problems because communication with all parties will be impossible.

The only saving grace is that the field technician and engineers will always be there to fix design engineering mistakes.


- Stephen Curyk, P.E., Lago Vista, TX


Have a comment? Put Feedback in the subject line of an email to controleng(at)cfemedia.com.

Also submit advice online in the Tips and Tricks section at www.controleng.com/events-and-awards/ce-tips-and-tricks.html.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.