Expanded boiler/water heater line

MagnaTherm boiler/volume water heater line includes 1.6, 2, 2.5, 3, 3.5, and 4 million Btuh sizes.

03/23/2015


MagnaTherm boiler/volume water heater line, now to include 1.6, 2, 2.5, 3, 3.5 and 4 million BTU/Hr sizes.The MagnaTherm boiler/volume water heater line includes 1.6, 2, 2.5, 3, 3.5, and 4 million Btuh sizes. The modulating-condensing systems have 95% thermal efficiency and a 5:1 turndown. The systems also have a small footprint, slim vertical design with removable top section, a stainless steel heat exchanger, and multiple voltage options. The MagnaTherm meets all ASME requirements and is AHRI certified. The boiler features an advanced VARI-PRIMETM pump control that seamlessly matches boiler firing rate to pump flow, reducing boiler pumping costs by up to 70%. This on-board control functionality balances combustion, air flow, and water flow to optimize boiler efficiency. A color touchscreen display results in quick setup and diagnostics. Up to 8 MagnaTherms can be controlled in a cascading boiler bank.

Laars

www.laars.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
BIM coordination; MEP projects; NFPA 13; Data center Q&A; Networked lighting controls; 2017 Product of the Year finalists
Emergency lighting; NFPA 3 and 4; Integrated building systems; Smart lighting, HVAC design
Designing for energy efficiency; Understanding and applying NFPA 101 for mission critical facilities; Integrating commissioning and testing for fire alarm systems; Optimizing unitary pumping solutions
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
click me