Electrical systems: Designing electrical rooms

Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation, and possible future expansion.

12/06/2014

Flash is required!

Electrical rooms provide safe and secure spaces for the operation and maintenance of electrical equipment. While electrical equipment types and ratings can have significant impacts on electrical room requirements, distributing the electrical power to the rest of the building via wiring, busways, and raceways can also affect electrical room design.

Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation, and possible future expansion. And the wiring, busways, and raceways that distribute the electrical power must be accounted for—now, and in the future. Documentation and monitoring of electrical system's equipment and how it connects to the rest of the facility must be accurately maintained.

The design of electrical rooms requires an integrated approach among disciplines. Architects and structural, mechanical, and fire protection engineers should work as a team in designing these rooms. NFPA 70: National Electrical Code (NEC) is the main source for electrical room requirements, but other codes, good practices, and recommendations should be considered. The result will be a room that is safe and secure, and provides for the functional operation and maintenance of the specific electrical equipment located within.

Learning objectives:

  • The audience will understand the applicable code requirements including NFPA 70: National Electrical Code
  • Attendees will learn the design criteria for appropriate electrical room size to accommodate present and future needs
  • Viewers will understand the requirements for coordinating with structural, architectural, fire protection, and HVAC requirements
  • Viewers will understand the requirements for foreign systems such as ductwork and piping

Speakers:

Brian Rener, PE, LEED AP, Associate, SmithgroupJJR, Chicago

Brian Martin, PE, Portland Electrical Department Manager, CH2M Hill, Portland, Ore.

Moderator: Jack Smith, Consulting-Specifying Engineer, Pure Power, and CFE Media, LLC



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
BIM coordination; MEP projects; NFPA 13; Data center Q&A; Networked lighting controls; 2017 Product of the Year finalists
Emergency lighting; NFPA 3 and 4; Integrated building systems; Smart lighting, HVAC design
Designing for energy efficiency; Understanding and applying NFPA 101 for mission critical facilities; Integrating commissioning and testing for fire alarm systems; Optimizing unitary pumping solutions
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
click me