Electrical fire pump with emergency generator

In this case study, an onsite generator must provide the secondary source of power for the fire pump.

03/24/2016


Figure 2: Power feed to the fire pump is shown via a direct connection from a utility transformer. Courtesy: WSP + ccrdThe building's normal power service is supplied from a pad-mounted utility transformer that is fed by a singular utility substation. The authority having jurisdiction has deemed that the single utility service is not considered a reliable source, so it cannot be the only supply source for the fire pump. An onsite generator must provide the secondary source of power for the fire pump. The service to the fire pump will need to meet the requirements as defined by NFPA 70: National Electrical Code (NEC) 695.3(B)(2) for service from an individual source and onsite standby generator.

The primary supply to the fire pump controller will come directly from a connection at the utility transformer. This was coordinated with the utility company; most will allow for this separate connection to be tapped at the transformer. This meets the requirement for continuity of power as defined by NEC 695.4(A) (direct connection). The feeder from the switchgear to the fire pump controller (located in a different area) will be routed below the building floor slab so that it is considered outside the building per NEC 230.6(1).

The second source for the fire pump will come from the emergency power system for the building. The building's generator system will be sized to handle the starting and normal operating load of the fire pump as defined by NED 695.3(D)(1). A circuit breaker, sized to accommodate normal start-up of the pump, will be located in the emergency distribution board. The second feeder will route overhead to the fire pump controller and be encased in a minimum of 2-in. concrete.

 


Sarah Kuchera is senior vice president and electrical engineer at ccrd + WSP. Her duties have included project management, production coordination, and project engineering on a variety of different projects including hospital, retail, hospitality, and office buildings. 



Edwin , FL, United States, 04/27/16 03:42 PM:

My only comment is consideration could be given to isolate the feeder breaker to the FPC/TS that is shown as part of the EDP.
Otherwise a fault in the EDP may prevent power to the FPC/TS.
CONSTANTINE , NJ, United States, 05/24/16 04:07 PM:

Please provide a real life example with analysis calculations, wiring and all that is required. It seems all the articles so far repeat the same thing. Codes and standards.
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me