SEARCH Archives
Loading
Sponsored by:

EGSA elects officers and directors for 2010

EGSA has announced the election of officers and three new board members for 2010. “The association would like to thank those leaving its Board of Directors and express its appreciation for their valuable contributions and continuous support,” said Jalane Kellough, EGSA Executive Director.

11/01/2009


        EGSA has announced the election of officers and three new board members for 2010.

         

        “The association would like to thank those leaving its Board of Directors and express its appreciation for their valuable contributions and continuous support,” said Jalane Kellough, EGSA Executive Director. “At the same time, EGSA would also like to welcome those newly elected to the board and thank them for taking an active role in the association.”

         

        EGSA officers for 2010 are:

         

        • President: Ron Hartzel, Eaton Corp., Moon Township, Pa.

        • President-Elect: John Kelly Jr., Kelly Generator & Equipment Inc., Owings, Md.

        • Vice President: Michael Pope, Süd-Chemie Inc., Needham, Mass.

        • Secretary-Treasurer: Debra Laurents, Cummins Power Generation, Minneapolis

        • Immediate Past President: Greg Linton, JRS Custom Fabrication, Ocala, Fla.

        Also elected to the Board of Directors were:

         

        • Brad Fennell, Chillicothe Metal, Chillicothe, Ill.

        • Ronald Schroeder, ASCO Power Technologies, Florham Park, N.J.

        • Mark Steele, Technology Research Corp., Clearwater, Fla.

        The newly elected officers will join the following directors who remain on the board through the coming year:

         

        • David Brown, Kohler Co., Kohler, Wis.

        • Joe Hafich, Emergency Systems Service Co., Quakertown, Pa.

        • Bobby McDonald, Generator Service Co. Inc., Hueytown, Ala.

        • Al Prosser, MTU Onsite Energy Corp., Mankato, Minn.

        • Greg Walters, Kim HotStart Co., Spokane, Wash.

        • Mike Witkowski, Pritchard Brown, Baltimore

        The newly elected officers and board members will be seated on the EGSA Board of Directors Jan. 1, 2010.

         



        No comments
        Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
        Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
        The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
        40 under 40
        Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
        Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
        Case Study Database

        Case Study Database

        Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

        These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

        Click here to visit the Case Study Database and upload your case study.

        Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
        Preventing arc flash, Backup power fuel choices, power for high-tech facilities
        Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

        Poll of the Week

        What percentage of your time is spent commissioning building projects?
        0% to 25%
        26% to 50%
        51% to 75%
        75% to 100%


        Click Here for Poll Archives
        Sponsored by:

        About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
        Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
        Control Engineering | Plant Engineering | Consulting-Specifying Engineer
        All content copyright © 2010-2013 CFE Media. All rights reserved.