EEA Consulting Engineers: Thermal Utility and Electrical Masterplan

Generation and distribution project as part of a master plan at an educational facility.

08/14/2014


Engineering firm: EEA Consulting Engineers
2014 MEP Giants rank: 83
Project: Thermal Utility and Electrical Masterplan
Address: Huntsville, Texas, U.S.
Building type: Educational facility,Utilities/public works/transportation
Project type: Other
Engineering services: Electrical/power, HVAC/mechanical, lighting, energy/sustainability, plumbing/piping, and other
Project timeline: 4/16/2012 to 3/27/2013
MEP/FP budget: $194,500

Challenges

The project is a study of the 7,000-ton chilled water, 18,000 MBTU heating water, and electrical systems on campus and is part of a larger master planning project for Sam Houston State University performed by SmithGroupJJR. The following components were included in this study:

  1. Campus thermal utility cooling and heating load analyses
  2. Hydraulic models of the 33-building campus chilled and heating water systems as they are currently installed, as well as models depicting the campus master plan and resulting recommended utility infrastructure upgrades and improvements
  3. Thermal expansion model of the east campus heating water loop replacement
  4. Campus electrical system load analysis, short circuit and coordination study, and harmonic study.

The majority of the new master planned construction was located on two separate ends of campus. This created the challenge of providing new utilities to two new portions of the campus within a short period of time. Existing and new construction in addition to landscaping, known existing utilities, and general constructability were all considered in routing the new utilities throughout the campus. Initial capacity and distribution issues with the campus utility generation systems needed to be addressed in the master plan. Recommended scheduling was needed to identify priorities and coincidences with other planned projects on the campus. The university's desire for general system redundancy, coupled with several high-priority buildings, also needed to be integrated into the utility masterplan. Minimizing both system downtime and interruption to surface traffic were also extremely important considerations.

Solutions

The final master plan for the system maximized usation of existing generation and distribution equipment (both in plants and piping) to allow for phasing of the utility infrastructure upgrade installations. This was to be done in two ways:

  1. Renovation of existing equipment to maximize capacity, and
  2. Connecting to the existing system in strategic locations that would maximize use of the existing piping under normal operating conditions.

The end result was a utility master plan that would provide a robust and redundant generating and distribution system capable of providing reliable utility service to the existing and planned customer buildings far into the future.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me