SEARCH Archives
Loading
Sponsored by:

Decoding the green construction codes

Engineers should understand the difference between IgCC and ASHRAE 189.1 energy compliance code provisions.

Bridgette Baugher, PE, CEM, LEED AP, Southland Industries, Dulles, Va.

09/18/2012


Voluntary green building rating systems such as the U.S. Green Building Council’s LEED program have had significant impacts on the building industry. Some jurisdictions have attempted to make LEED certification a requirement for new buildings but have encountered a need for a code compliance path to document performance. The USGBC assisted in the development of both the ICC International Green Construction Code (IgCC) and ASHRAE 189.1, Standard for the Design of High-Performance, Green Buildings Except Low-Rise Residential Buildings, to fill this void.

Both codes focus on the five categories of sustainability addressed in LEED New Construction: Site Sustainability, Water Use Efficiency, Energy Efficiency, Indoor Environmental Quality, and Materials and Resources. Furthermore, both codes include an additional section regarding Operation and Maintenance.

The IgCC and Standard 189.1 are not guides or ratings systems. They are written in mandatory code language and intended for adoption and enforcement by the local and state level. In earlier versions of IgCC, ASHRAE 189.1 was a “jurisdictional compliance option,” meaning the local authority must choose between 189.1 and IgCC. With IgCC 2012, a building may now choose to comply with its standard requirements or those of 189.1.

Several major differences within the energy efficiency sections differentiate the two codes. With all energy units converted to Btus, IgCC is based on source energy use, while ASHRAE 189.1 is based on site energy cost. Just as energy cost and energy consumption are two completely different metrics, so are site and source energy. Different energy-saving measures will apply to a project, depending whether site energy cost or source energy use is the applicable metric. A model executed according to the calculations of one code cannot easily be compared to the other. A section of the IgCC also requires that the person performing the energy simulation be a professional engineer or architect in the state where the project is being constructed; ASHRAE 189.1 currently does not have a similar requirement.

Both codes contain comparable requirement categories in other sections, but with notable differences. The following table summarizes the key differences between ASHRAE 189.1 and IgCC 2012:

The IgCC has more detailed requirements for building energy metering and demand response, while ASHRAE 189.1 provides more detailed sections on fan power and demand controlled ventilation. If a project requires compliance with IgCC, there is always the option of using either IgCC or ASHRAE 189.1. For projects pursuing LEED certification, the energy model will compare energy cost. Overall, using ASHRAE 189.1 as a compliance path can minimize modeling time and increase cost-based savings.

 


Bridgette Baugher is an energy engineer with Southland Industries. Her career focus is on improving energy efficiency in new and existing buildings through the use of analysis and auditing tools. She served on the Center for the Built Environment’s Livable Buildings Jury in 2009 and 2010.   



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.