Critical power: Transfer switches in switchgear

Consulting engineers must understand transfer switch types, timing requirements, ratings, and the effects that the characteristic of each emergency load has on generator operation.

02/08/2015

Flash is required!

When an interruption of electrical power occurs, an automatic transfer switch shifts loads between utility and generator power. During these transitions, transfer switch timing and sequence is critical to ensure proper system operation. Consulting engineers must understand transfer switch types, timing requirements, ratings, and the effects that the characteristic of each emergency load has on generator operation. They must also understand how a facility's electrical system (available fault current, number of generators, paralleling configuration) affects transfer switch choices.

Learning objectives:

  • The audience will understand the applicable codes: NFPA 110: Standard for Emergency and Standby Power Systems and NFPA 70: National Electrical Code (NEC)
  • Viewers will learn about open-and closed-transition automatic transfer switching including transfer switch timing and bypass considerations
  • Viewers will learn how to properly apply transfer switches and switchgear
  • Viewers will learn how to select transfer switch timing and sequencing to assure that the generator will assume and operate the selected loads.

Speakers:

Ken Lovorn, PE, Lovorn Engineering Associates, Pittsburgh

Danna Jensen, PE, LEED AP BD+C, ccrd partners, Dallas

Moderator: Jack Smith, Consulting-Specifying Engineer, Pure Power, and CFE Media, LLC



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Designing for energy efficiency; Understanding and applying NFPA 101 for mission critical facilities; Integrating commissioning and testing for fire alarm systems; Optimizing unitary pumping solutions
Economics of HVAC systems; NFPA 110-2016; Designing and choosing modular data centers
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
click me