Consulting engineers must understand transfer switch types, timing requirements, ratings, and the effects that the characteristic of each emergency load has on generator operation.

02/08/2015

Flash is required!

When an interruption of electrical power occurs, an automatic transfer switch shifts loads between utility and generator power. During these transitions, transfer switch timing and sequence is critical to ensure proper system operation. Consulting engineers must understand transfer switch types, timing requirements, ratings, and the effects that the characteristic of each emergency load has on generator operation. They must also understand how a facility's electrical system (available fault current, number of generators, paralleling configuration) affects transfer switch choices.

Learning objectives:

  • The audience will understand the applicable codes: NFPA 110: Standard for Emergency and Standby Power Systems and NFPA 70: National Electrical Code (NEC)
  • Viewers will learn about open-and closed-transition automatic transfer switching including transfer switch timing and bypass considerations
  • Viewers will learn how to properly apply transfer switches and switchgear
  • Viewers will learn how to select transfer switch timing and sequencing to assure that the generator will assume and operate the selected loads.

Speakers:

Ken Lovorn, PE, Lovorn Engineering Associates, Pittsburgh

Danna Jensen, PE, LEED AP BD+C, ccrd partners, Dallas

Moderator: Jack Smith, Consulting-Specifying Engineer, Pure Power, and CFE Media, LLC



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
40 Under 40; Performance-based design; Clean agent fire suppression; NFPA 92; Future of commissioning; Successful project management principles
BIM coordination; MEP projects; NFPA 13; Data center Q&A; Networked lighting controls; 2017 Product of the Year finalists
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.