Carl R. Darnall Army Medical Center March update

South Clinic TAB is completed. Functional performance testing on the boiler system, water softener, and domestic water heat exchangers is underway.

03/09/2015


March 2015 update:

  • South Clinic has been turned over to the client for equipment delivery.
  • South Clinic functional performance tests are completed.
  • Chlorination of the domestic water system in the clinics is completed.
  • Hospital TAB for the basement and level 1 is completed.
  • Hospital basement has been turned over to the client for equipment delivery.
  • Hospital level 1 is projected to be turned over to U.S. Army Corps of Engineers mid-March.
  • Steam system load test is completed along with functional performance testing.    

Front view of the Hospital. Courtesy: Chris McKee Atrium under construction. Courtesy: Chris McKeeHospital parking garage. Courtesy: Chris McKee



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me