BIM and fire protection engineering

04/22/2013


Challenges and issues 

While content development for models could improve, BIM is not without other issues. As many organizations that have worked on BIM projects have discovered, it requires a significant shift from traditional architectural and engineering workflow. Since the model is constantly developing, 2-D drawings to drafters may not be the most effective routine. Engineers and designers need to get directly into the model and input information as the model develops. It is not just showing information in space, but providing specifications of equipment as the model is developed. The designer is actually inserting the component into the model, similar to how the installer inserts the component in the building. 

Since BIM models are not just 3-D representations of a building but an information database correlated to that model, the file sizes get very large. As noted previously, cloud server models may be an ideal solution for certain applications, but some owners and developers may want to limit access to the organizations that can make changes. In such situations, the model may be updated routinely for other organizations to download and work from, which can be challenging when dealing with large file transfers. 

Another recognized obstacle is the contractual and legal issues concerning intellectual property rights and how BIM models are accessed or made available. Standard design contracts often establish who owns the rights to the intellectual property, which can be contentious during and after negotiations. Multiple parties are providing input into a model that the owner may ultimately be paying for. While, under such conditions, the project owner(s) may feel entitled to unrestricted use and access, the designers may want limitations on who can access the model and how access is controlled. Since the designers, engineers, and architects may not input proprietary equipment into the model, procedures and terms for how contractors and installers input information into the model without significantly changing the system parameters must be established. In other words, a clear method for handing over from design to construction and from construction to operations must be established to protect all parties and their respective intellectual property. 

As with most design disciplines, BIM and fire protection engineering will continue to develop into a more powerful tool that allows designers, owners, and building personnel to effectively use models and BIM databases to manage buildings from cradle to grave. All active and passive fire protection systems, from suppression, alarm, and detection to fire-resistance rated walls, floors, and ceilings can be managed and maintained by all parties associated with buildings. The current and future status of BIM technology related to fire protection engineering is exciting for everyone in the building and construction industry. 

Imagine the time when you can design a building using actual assemblies and components, check for conflicts prior to reaching the field, and then install and maintain those components through an efficient and functional BIM model. That time is now. What the future holds is how far we can capitalize on the benefits of integrating the BIM model.


Gregory K. Shino is technical director of fire protection engineering at JBA Consulting Engineers, with more than 15 years of experience in design and commissioning of fire suppression, fire alarm and detection, and smoke control systems. He is a member of SFPE, NFPA, and the ICC.


<< First < Previous 1 2 3 4 5 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Water use efficiency: Diminishing water quality, escalating costs; Lowering building energy use; Power for fire pumps
Building envelope and integration; Manufacturing industrial Q&A; NFPA 99; Testing fire systems
Labs and research facilities: Q&A with the experts; Water heating systems; Smart building integration; 40 Under 40 winners
Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.