SEARCH Archives
Loading
Sponsored by:

BCA names Fischer executive director

The Building Commissioning Assn. has named Liz Fischer as its executive director.

04/10/2012


Liz Fischer, who was named Executive Director by the Building Commissioning Association (BCA). Courtesy: BCAThe Building Commissioning Assn. (BCA) has named Liz Fischer as Executive Director effective April 2, 2012. Fischer has acted as association manager since 2005.

"I am personally very excited to have Liz Fisher joining the BCA as our full time Executive Director," said Mark Miller, president of the International Board of Directors. "Her leadership skills, knowledge of the commissioning and energy industry and relationships with key stakeholders will be invaluable in helping the BCA continue to grow, advance the commissioning industry and make buildings reach their performance potential."

Fischer has spent the past 23 years in the energy efficiency industry, as one of PECI's strategic and business development leaders. Her experience has included managing program budgets, personnel, partner relationships, and reporting for federal and utility clients. Her knowledge spans beyond the built environment and includes in-depth experience in training and education. She has led the production of the industry’s longest running commissioning conference, the National Conference on Building Commissioning, as well as the creation of a comprehensive training program for commissioning authorities and energy auditors.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.