Baylor College of Medicine Special Care Center

Renovation: Baylor College of Medicine Special Care Center; Smith Seckman Reid Inc.

08/09/2012


Baylor College of Medicine Special Care CenterProject name: Baylor College of Medicine Special Care Center

Location: Houston, Texas

Firm name: Smith Seckman Reid Inc.

Project type, building type: Renovation, hospital

Project duration: 2.5 years

Project completion date: Dec. 2013

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $17 million

Engineering challenges

Challenges included preparing documents to complete the building infrastructure of a previously unfinished shell building for chilled water, steam, electrical, emergency power, domestic hot and cold water systems, and heating hot water systems in concert with architectural work to create required 2-h separations needed with functioning life safety systems to (1) comply with the requirements for an unoccupied, yet code-compliant building and (2) identify MEP equipment needed or anticipated to be utilized to serve several phases of finish-out of portions of the building while keeping construction costs of these systems limited to the potential project finish-out. Challenges faced by MEP engineers and designers included survey of existing equipment already installed but not placed into service; identification of equipment purchased but not yet installed; identification of existing equipment capacity and its capability to serve the proposed finish-out, which in some instances was different than the original design intent; and a determination as to the condition of the equipment due to its sitting idle and unused in an enclosed but unconditioned environment.

Solutions

Solutions to the challenges, while seemingly obvious, required a lengthy thought and planning process that involved the owner and the original installing contractors. Additionally, to establish a starting point, we needed to review existing product submittals; review work actually installed versus original design intent to determine where work was stopped and if it was completed; review and discuss what work was previously permitted, and if there were open permits for any of the work to determine what documentation was needed to complete the work; and, finally, to determine how remaining shell spaces and building smoke control would be accomplished within a partially occupied and finished building, which just happened to be a high-rise building with both I2 and B occupancies. We also needed too identify what should be in place to be able to finish out the building under an aggressive completion schedule once the space planning was completed. The project was initiated in early summer and the enclosed but unconditioned, nonventilated building (in Houston) created its own unique challenges when we surveyed the building. Documents were prepared in four phases to address the project requirements in an orderly process, so the work could be competed, inspected by the city, and permits closed before new work could proceed under new permits in order for the infrastructure to be ready and able to serve the finish-out.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.