Arup Thoughts: How can we prepare for multi-hazards?

Are engineers and designers doing enough to limit the impacts of natural and man-made disasters? Could a better instant response to hazard scenarios reduce casualties?

06/25/2015


Natural and man-made disasters can strike simultaneously. So is it possible to be totally prepared for any multi-hazard, such as the earthquake, tsunami and nuclear disaster that hit Japan four years ago this month?

I don’t think it is. But are we doing enough? Is our responsibility as designers and engineers limited to meeting regulations? Sure, we cannot predict the future, but do we have to wait till disaster strikes to consider changes?

Are engineers and designers doing enough to limit the impacts of natural and man-made disasters? Could a better instant response to hazard scenarios reduce casualties? Courtesy: ArupEarthquakes and tsunamis are rooted deep in Japan’s history and its society is well drilled and prepared for these natural disasters. It has stringent seismic design standards and its advanced early warning system gives people valuable seconds to prepare for impact. Major infrastructures such as railways and nuclear power plants are supposed to automatically and safely shut down.

Nevertheless, no matter how well prepared Japan was in March 2011 three major disasters struck together at a magnitude nobody had imagined. Four years later, the statistics are disheartening. People’s lives remain devastated, with some still living in emergency shelters waiting to return home. So I think we have to ask how things could be done better.

Could a better instant response to hazard scenarios reduce casualties? Could you make providing people with instantaneous evacuation information about their particular location a standard feature on mobile phones? I think you could achieve this by using typically static big data in a dynamic way.

You could link data from sensors – such as seismographs – in real-time with an in-depth property database and feed that back to those who need it. You could update phone owners about safe evacuation routes based on their location, and you could also use this information to let rescue workers and social media know where people are.

Could you speed up recovery following disasters too? One option might be to develop recovery models for cities, or even whole areas, that include emergency shelters. This would enable planning and design to be done more efficiently and bring relief more quickly when disasters strike.

I don’t pretend to have all the answers and I don’t want to be a doom-monger; I’d just like to throw some questions out there and let you reflect for a second. What are the short and long-term consequences of major tragedies like that in Japan? How would you react if a multi-hazard happened? What could be done better?

After all, I believe that being conscious of past events takes us one step closer to being better prepared.

Piet Lycke is an architect engineer at Arup. This article originally appeared on Arup Thoughts. Arup is a CFE Media content partner. Edited by Joy Chang, CFE Media, jchang@cfemedia.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me