Art of protecting electrical systems

From 1965 through 1970, Consulting-Specifying Engineer’s predecessor, Actual Specifying Engineer, ran a series of articles on overcurrent protection. Due to the immense popularity of the 31 installments in the series, the authors, George Farrell and Frank Valvoda, PE, reprised the series in an updated version beginning in the Feb.

10/01/2007


From 1965 through 1970, Consulting-Specifying Engineer’s predecessor, Actual Specifying Engineer, ran a series of articles on overcurrent protection. Due to the immense popularity of the 31 installments in the series, the authors, George Farrell and Frank Valvoda, PE, reprised the series in an updated version beginning in the Feb. 1989 issue of CSE.

Over the years since the last installment ran in the late ’90s, we have received many requests to re-run this series. Consequently, we are making the series available as monthly installments at www.csemag.com . In September, we posted Part 12, “Approximating Short-Circuit Calculations for Conductors.”

“Large or complex radial systems, closed-loop systems ,and networks require analysis by the per-unit method,” explained the authors. “However, for many straightforward radial systems, short-cut methods provide a quick, safe approach to determining fault currents for equipment application.”

These estimates are valid even for final calculations, depending on the project’s size and the fault current available from the utility. This article describes a short-cut method for calculating the decrease in fault current caused by circuit conductors.

The October installment in “The art of protecting electrical systems” series is about calculating short-circuit currents at secondary of transformers. While Part 12 presents a point-to-point method of calculating short-circuit currents, in Part 13 offers similar tables but ones that were updated to provide values of available fault currents at the secondaries of standard and low-impedance three-phase transformers.

In November, look for Part 14 of this series in the Electrical community at www.csemag.com , which offers a step-by-step guide for calculating four types of single-phase faults.





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me