American Aerogel Expansion of Production Capacity

System overhaul: American Aerogel Expansion of Production Capacity; Optimation


Optimation mechanics, pipefitters, and electricians installed and expanded service lines to increase production capacity.Project name: American Aerogel Expansion of Production Capacity

Location: Rochester, N.Y.

Firm name: Optimation

Project type, building type: System overhaul, manufacturing

Project duration: 1.7 years

Project completion date: Sept. 30, 2008

Engineering challenges

American Aerogel, a company developing and manufacturing proprietary Aerogel insulation products, had been growing rapidly and needed to expand its production capabilities. Because demand for its product was so high, American Aerogel’s 24/7 operation required new equipment with process improvements to increase production and improve efficiencies. Because American Aerogel’s products are made with a proprietary one-of-a-kind aerogel called Aerocore, maintaining confidentiality of the products’ chemical makeup and patented manufacturing processes was/is of the utmost importance. Optimation continues to honor this confidentiality.


American Aerogel needed to expand production capabilities to meet a growing demand for its insulation product.American Aerogel brought Optimation in early on to assess the existing production equipment, processes, and available space to increase capability to remove and recover solvents from its products. Optimation developed drawings with the layout of the new and relocated production equipment and associated services. Optimation’s skilled trades team, comprised of millwrights, pipefitters, riggers, and electrical and instrumentation mechanics, completed installation of all production equipment and associated components. In addition to installing new equipment, mechanics made modifications to existing services to increase capacity. These services included electricity, steam, compressed air and nitrogen supplies, and condensate return and process vapor recovery. Optimation also assembled and installed all instrumentation/control cabinets, and led debug and startup of all installed systems. After this project was completed, production capacity increased significantly. The addition of instrumentation and improved access to the process information improved productivity and product quality. 

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Salary survey: How much are you worth?; Dedicated outdoor air systems; Energy models and lighting
Fire, life safety in schools; Fire protection codes; Detection, suppression, and notification; 2015 Commissioning Giants; Emergency and standby power in hospitals
HVAC and building envelope: Efficient, effective systems; Designing fire sprinkler systems; Wireless controls in buildings; 2015 Product of the Year winners
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Implementing microgrids: Controlling campus power generation; Understanding cogeneration systems; Evaluating UPS system efficiency; Driving data center PUE, efficiency
Optimizing genset sizing; How the Internet of Things affects the data center; Increasing transformer efficiency; Standby vs. emergency power in mission critical facilities
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.