SEARCH Archives
Loading
Sponsored by:

A giant pressure cooker

The tension has been bubbling in the mechanical, electrical, plumbing, and fire protection engineering fields for some time now, and it’s causing changes in how these firms do business.

By Amara Rozgus

08/19/2011


Based on several conversations I’ve had with readers, a pressure cooker is about to go off in the engineering community. The tension has been bubbling in the mechanical, electrical, plumbing, and fire protection engineering fields for some time now, and it’s causing changes in how these firms do business.

For one, firms are busier. They’re fielding more requests for proposals, and the proposals that were on hold are starting to take off as money is released. The biggest problem: Firms still aren’t hiring. Engineers are being pushed to the limit, and are working 60-, 70-, and 80-hour weeks. Firms that are hiring are being very selective—they are cherry-picking the best talent.

Some firms are hiring entry-level engineers (or engineers in training) because they have smaller starting salaries. Though the long-term payback is high on engineers that you can mold to fit your company’s needs, these young engineers need mentoring and guidance in their first few years on the job, which can cost the more seasoned engineers time and energy. Mentoring is just one small piece of the puzzle; quite a few other pieces will be discussed at the Career Smart Engineers Conference Oct. 12 to 13 in Chicago. I encourage you to join us to help push your firm to the next level of business and communications.

Despite this human resources pressure, many engineering firms are excelling. We’ve ranked the top firms based on MEP design revenue in the annual 2011 MEP Giants report. In a series of articles, we explain how they are reacting to the market and other challenges. The No. 1 challenge: The economy’s impact on the construction market. No 2: Evolving information technologies for design or project management. As you might expect, there have been a lot of mergers and acquisitions this year, which Mick Morrissey discusses on page 36. (Spoiler alert: One-fifth of the MEP Giants were either acquired or merged in the past year. Talk about pressure!)

Another interesting trend gleaned from the 2011 MEP Giants data: new construction and retrofits are neck-and-neck in revenue (each came in at 41%). In 2010 it was also close: 32% new construction revenue and 30% retrofit revenue. In 2009, new construction was ahead at 45%; retrofits were at 38%. In 2008, new construction was ahead at 45%, and retrofits lagged at 32%. This shows that since the recession started in 2008, pressure to do more retrofits is increasing, and the percentage of new construction projects has remained relatively flat.

Please send me a note at arozgus(at)cfemedia.com. I’d like to hear about your work pressures, and how they’re pushing you to work differently.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.