SEARCH Archives
Loading
Sponsored by:

4SIGHT helps facilities capitalize on productivity using real-time data

Yard and Dock Management System integrates intelligent software with simple interface, uniting gaps between industrial warehousing, transportation

01/18/2011


4SIGHT Yard and Dock Management System takes your operation to the next level by integrating your facility with intelligent software to monitor, schedule, and communicate trailer movement, load assignment, and loading dock status in a simple, easy-to-use interface.4Sight Yard-Dock Management System

4SIGHT bridges the gap between warehousing and transportation, thereby alleviating common logistics problems. This system combines RFID, GPS and sensor technologies to provide companies with real-time yard and loading dock visibility, enabling them to improve trailer coordination and turn time management. The robust event-management capabilities and alert notifications reportedly help reduce the labor associated with moving and managing yard assets.

The 4SIGHT solution offers full automation, visibility and optimization from the time a vehicle approaches the inbound gate, throughout dock activity and trailer movement around the yard, to the time a vehicle leaves through the outbound gate.

Components of 4SIGHT include:

  • Graphic Interface of the yard and loading dock provides color-coded, exact location mapping and activity display.
  • Gate Management provides visibility of inbound and outbound equipment.
  • Load Assignment and Dock Door Scheduling allows managers to assign loads to specific trailers and optimize dock door usage.
  • Productivity and Activity Reports provide data on the utilization of trailers, dock doors, equipment status, switchers, etc.

In addition to its productivity tools, 4SIGHT also allows facilities to maintain their loading dock equipment based on actual usage as opposed to a traditional time-based maintenance schedule. Dock usage data is collected and displayed, and the system automatically identifies loading docks that reach a usage threshold. Once the threshold has been reached, an automated email will be sent to service providers and maintenance managers, and affected doors can be locked out for maintenance. 4SIGHT also includes a value-added benefit of increased security around the loading dock area, incorporating security cameras and built-in sensors to identify unauthorized dock door or trailer movement.

http://www.4frontes.com/

4 Front Engineered Solutions



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.