4 levels of asset reliability at steelmaker ArcelorMittal

Effective planning leads to effective maintenance, which ArcelorMittal learned during the economic downturn

10/29/2013


In building its World Class Equipment Reliability System at global steelmaker ArcelorMittal, USA maintenance division manager Scott Piech noted that the company had to teach some old dogs some new tricks.

“There was a lot of winning over folks who were doing things a certain way for a lot of years,” said Piech at the 2013 Bentley Systems Year In Infrastructure event in London on Oct. 29. “It takes a lot of coaching to convince them that it’s the right thing to do.”

Overcoming worker skepticism and a recession that slowed the process, the message seems to have taken hold. ArcelorMittal was one of three finalists for the Bentley award in Asset Performance Management.

Changing management always is a challenge, and it was for this company as well. “We thought the journey of going from reactive maintenance to proactive maintenance would take three to five years. It’s going to take seven to 10 years,” Piech said. The 2008 recession slowed their efforts to convert all U.S. plants to the WCER System, and the effort was streamlined to focus on critical areas.

“When we started the program,” Piech said, “the market for steel was red-hot. Tried to implement in all departments, but then the downturn hit and we didn’t have the resources. We just couldn’t do it for everything, so we focused on critical areas within the plants.” 

Piech said there were four primary levels of reliability at ArcelorMittal:

  • Planning and scheduling
  • Autonomous maintenance
  • Pareto and root cause failure analysis (RCFA)
  • Proactive maintenance  

While all were important, planning and schedule were the keys, especially in the retraining effort. “Planning and scheduling is the backbone of what you do,” said Piech. “If you’re not doing effective planning and scheduling, you’re not really doing good maintenance. We trained everyone at our USA plants to do this.

“Now have operators doing inspections. We were trying to get rid of that old idea where operators operate and maintainers maintain. We want everyone to own the equipment.”

They also rerouted maintenance workers from predictable routes to ones based on the analysis of data through the Bentley Ivara system. While some workers migrated to work orders through handheld or tablet devices, others continued to use paper. While the system didn’t require a preference, Piech has seen an uptick with tablet use lately. “When workers are going to be doing their inspection routes, the information can be downloaded to the tablets.”

Piech made several other key points:

  • There is a manager for proactive maintenance separate from a manager for planning and for corrective maintenance. “Firefighting always seems to come first, especially in maintenance,” he said.
  • The company knows some of its maintenance personnel have upwards of 30 years of experience. That experience will be retiring soon. “The people we hire as maintenance personnel will require a lot of training,” he said. That’s why standardizing training, maintenance and metrics was so important to the overall rollout of the WCER System at ArcelorMittal.
  • And as in most cases, good maintenance often goes overlooked. Maintenance only becomes visible when something breaks. “If you’re doing great maintenance, you’re there to support production,” Piech said.


Anonymous , 11/15/13 08:38 AM:

1. What is 'autonomous maintnenance'?

2.Is 'proactive maintenance' = TPM?
Anonymous , 11/15/13 08:49 PM:

I am trying to change 100 years of reactive maintenance into planned maintenance in one of the biggest mining company in the World and I think that I perfectly understand to Mr. Piech when he said that they "...had to teach some old dogs some new tricks". Is a very hard work!...I would like to know if it is possible that Mr. Peach come to south america for a conference?
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me