Building commissioning providers are closely tracking the business, market, and technical trends that are influencing—and, in some cases, reshaping—their profession. At the top of the list are priorities that affect practical business decisions, both near-term and in the future.


Learning objectives:

  • Introduce the top commissioning professionals, including the 2016 Commissioning Giants.
  • Explain the commissioning business model’s future and top business issues and expectations according to commissioning providers.

A recent study of commissioning industry stakeholders, conducted by the Building Commissioning Association (BCxA) shows that strategic and technical problems, needs, and outcomes are expected to shift the structure and function of the commissioning business model over the next 5 years and beyond.

Let’s be honest. For every business in every sector, it is about the money. Beyond that, it’s about value and results that last. Commissioning providers (CxPs) are finding themselves in the role of liaisons who connect silos of designers, builders, and owners’ personnel to deliver the promise of value and increasingly over time, a valuable (but not always valued) position.

In an effort to define what’s going on behind the scenes of daily contract fulfillment, field work, and forensics, the Building Commissioning Association (BCxA) reached out to commissioning providers and stakeholders to understand the top pressing business issues they foresee. A further technical online survey correlated both sets of information to gain a full picture of commissioning concerns and expectations.

The initial investigation included mostly CxPs with a sprinkling of designers, builders, owners, and facilities staff, representing six 1-hour mixed focus groups and an online business-focused survey. Attendees (BCxA members and nonmembers) were asked to describe their concerns over three separate time frames.

  • One year: The main concern over the next 12 months is arresting the commoditization of the commissioning market, whereas previous BCxA surveys indicated that training was the primary need. The second most important concern is creating targeted value propositions for commissioning and disseminating to appropriate audiences.
  • Two to 4 years: The biggest concern is identifying opportunities to grow the Cx business, followed closely by ensuring best practices are applied consistently across the Cx profession.
  • Five or more years: Two major concerns over the long term include succession planning and commissioning teams prepared for deeper engagement in building performance. Predominantly, outcomes were predicated on thinking through the long-term business model for the practice of commissioning and understanding the impact of shifts in design, construction, and operations on the practice of commissioning.

The top 10 business issues described by respondents are listed below for each time frame, representing challenges or solutions for CxPs and their clients to achieve the best value in project delivery.

Business issues for CxPs

Problems to solve within the next year: commoditization and value proposition

  1. Commoditization vs. quality performance
  2. Selling owners a clear, unquestionable value proposition, including ways to add value
  3. Educating owners and managers about commissioning content, process, timing, and benefits
  4. Recruiting qualified staff
  5. Integrating project teams and improving communication skills
  6. Scaling commissioning for projects of all sizes
  7. Creating consistent contract documents written for the commissioning profession
  8. Working to mitigate the negative impact of codes that undermine Cx best practices
  9.  Developing a consistent approach and expectations for Cx in the private sector; reducing jurisdictional differences in the public sector
  10. Building performance criteria into design team deliverables.

Figure 1: Technical Cx survey distribution. More than 300 commissioning and associated firms across North America completed the BCxA survey of best practices. In 2016, the Best Practices Committee completed revising, expanding, and updating the New Constr

Two to 4 years: Needs to fill, opportunities to grow, and best practices

  1. Expanding company capabilities, such as bringing building-enclosure commissioning (BECx) in-house
  2. Integrating consistent best practices in design and delivery plans, expectations, and implementation among all players
  3. Formally educating allied professionals on the benefits they accrue from commissioning
  4. Developing tools to support continuous teamwork throughout the design-delivery process
  5. Finding ways to recruit as well as develop advanced skills among younger staff
  6. Creating resources to educate CxPs on the new wave of building technologies and validation tools
  7. Purging "check-the-box" and "drive-by" commissioning providers from the profession
  8. Increasing the focus on whole-building commissioning (WBCx)-beyond energy efficiency
  9. Improving project assignment manpower forecasting capabilities
  10. Focusing on "occupied optimization" of buildings.

Five or more years: outcomes to achieve; long-term business model

  1. Best practices carried farther into the industry, without being watered down, to realize the true value of commissioning
  2. Succession planning underway to replace the aging market: mentoring the next generation of commissioning leaders who are looking for increased work/life balance
  3. Prepared teams for existing building commissioning that includes deep energy retrofits, distributed energy, systems interoperability, and integrated building information-management systems
  4. Updated study on commissioning data to help CxPs establish and explain value-costs and benefits similar to the 2009 LBNL Study by Evan Mills
  5. Streamlined methods to integrate new technologies with legacy systems
  6. Commissioning curriculum offered in college and university programs
  7. Expanded and diversified commissioning education that concentrates on the high skills needed for complex buildings, future smart grid issues, demand response, self-generation, energy-recovery systems, microgrids and renewables, net zero, and associated operational complexity
  8. Integrated technical adaptation in step with goals, such as the Architecture 2030 Challenge
  9. Next-generation utility, government, and private sector programs implemented to facilitate superior building performance through commissioning
  10. Adequate workforce capacity to design, build, commission, and operate at an upscale level.

Best practices for technology issues

A second data set, an online survey of CxP firms and associated technical service providers, was correlated with the business-focused responses above. This “best practices” survey yielded more than 300 responses about priorities for technology advancements, practical tools and automation, market conditions, and training topics to meet future building needs. Respondents represented commissioning practices across the U.S. and Canada. Survey respondents’ distribution is shown in Figure 1.

<< First < Previous 1 2 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
MEP Giants; MEP Annual Report; Mergers and acquisitions; Passive, active fire protection; LED retrofits; HVAC energy efficiency
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me