SEARCH Archives
Loading
Sponsored by:

2011 Automation Summit: Navigating the World of Automation by Siemens Industry Inc.

Siemens Industry Inc. holds its 2011 Automation Summit, "Navigating the World of Automation," June 27-30 at Disney's Yacht & Beach Club Resorts in Orlando, FL.

05/11/2011


Siemens Industry Inc. holds its 2011 Automation Summit, "Navigating the World of Automation," June 27-30 at Disney's Yacht & Beach Club Resorts in Orlando, FL. 

The 2011 Automation Summit is loaded with activities, including more than 50 breakout sessions featuring presentations and best practices case studies from end users and industry experts, the company said. Also featured are networking events, a technology showcase, live demonstrations and hands-on training sessions.

“While we plan to educate end users about Siemens portfolio of automation, instrumentation, motion control, software and MES solutions and technologies, our primary objective is to provide a forum for the community to share information, and determine how each person can best implement these recommendations and strategies at their respective sites,” says Raj Batra, president of the Industry Automation Division for Siemens Industry, Inc.

New to the Automation Summit is the Technology Café where users can experience the breadth and depth of the Siemens portfolio and meet with Siemens experts in an informal, hands-on and personalized environment.  The Summit will also feature Siemens Measuring Success tour, a 53-foot tractor trailer where participants can interact with Siemens process instrumentation, analytics and controls for a customized and meaningful experience.

Craig Russell, chief design and project delivery executive for Walt Disney Imagineering, will be the keynote speaker.  Russell serves as the co-executive leader of the creative delivery arm of Walt Disney Parks and Resorts.  In his role, Russell is responsible for the design, engineering, production, installation and project management for Imagineering Theme Park and Resort projects globally.

Siemens will also announce its Customer Excellence Awards during a ceremony at Epcot where guests will be treated to a front row view of the spectacular fireworks show.

Registration and additional Summit details are available by visiting www.usa.siemens.com/summit

In addition to the Automation Summit, Siemens also offers its Users Community Online Portal where visitors can pose questions to our global user community, learn about best practices, share information and participate in on-demand webinars. 

Visit www.usa.siemens.com/processusercommunity to register today. 

For live event coverage of Siemens Automation Summit on twitter, follow #automationsummit.

www.industry.usa.siemens.com/topics/us/en/summit/Pages/summit.aspx?stc=usiia500032



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.