SEARCH Archives
Loading
Sponsored by:

2010 POY Finalists: HVAC

Plant Engineering's 2010 Product of the Year finalists featured in the HVAC category.

11/15/2010


Vertical fan

The Pivot 180 by Big Ass Fans provides cooling air movement over large areas and is designed to be installed on a column or other vertical structure. In addition, Pivot 180’s oscillating function allows the air generated to radiate 100 feet outward, enveloping a 180 degree arc from side to side - a coverage area of an incredible 12,000 square feet. If more concentrated air movement is required, the oscillating function can be switched off easily and the fan aimed in one direction. For even more control, the fan can be easily pivoted up or down for optimal airflow.

Big Ass Fans


Radiant tube heater

The ultraSchwank is an efficient radiant tube heater suitable for indoor industrial and commercial applications, with ceiling heights up to 75 feet. It can be safely tucked into a roof structure and is available in lengths of up to 70 feet. The insulated reflector system featured in the ultraSchwank captures convection heat and increases tube and inner reflector surface temperatures for heat retention and comfort and lower air temperatures. Because more heat is directed where required convection heat losses are drastically reduced, with the added benefit of a 30% to 50% reduction of minimum clearance to combustibles required for installation.

The Schwank Group


Latching lid

PIG’s Fume-Removal Latching Lid reduces harmful vapor emissions while drum lids are temporarily open – without the expense of a fume cabinet or canopy. The latching lid connects to ventilation exhaust ducts so that drums can be located as needed near work areas and workers are still protected. The latching lid features a continuous nitrile gasket and locking mechanism to completely seal against leaks or detachment, even if the drum tips over. The 4” diameter port connects directly to ducting to provide a local collection hood while the suction inlets around the top opening capture the vapor.

New Pig Corporation


Combination Dryers

The Hybritec dryers are a compressed air drying solution from Kaeser which combine the energy savings of a refrigerated dryer with the exceptionally low dewpoints of a desiccant dryer. These units operate on an innovative premise: air is first treated by a refrigerated dryer to remove the majority of the air’s water vapor. Then the air is treated by a desiccant dryer to further reduce the dewpoint.

The Hybritec dryers also offer a consistent outlet dewpoint, reduced operating and maintenance costs, signicantly less power consumption, and much longer desiccant service life.

Kaeser Compressors



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.