12th District Police Station

New construction; 12th District Police Station; Primera Engineers Ltd.

08/15/2013


This image shows a rendering of the 12th District Police Station. Courtesy: Primera EngineersEngineering firm: Primera Engineers Ltd.
2013 MEP Giants rank:
91
Project:
12th District Police Station
Address:
Chicago, United States
Building type:
Office
Project type:
New construction
Engineering services:
Automation & Controls, Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
June 2009 to June 2012
Engineering services budget:
$400,000
MEP budget:
$1.25 million

Challenges

As part of the City of Chicago's "Neighborhood Alive" program, the Public Building Commission is building 12 new police stations across the city to replace existing facilities. These new prototype stations are 42,000 sq ft, twice that of the original stations. Primera Engineers was charged with developing an alternative to the original prototype design that included a geothermal system.

Creating an alternate prototype presented Primera with multiple engineering challenges, including the need to redesign the original prototype to include a geothermal and rainwater harvesting system without altering the overall building design or MEP spaces. In addition, the 88-well geothermal system was one of the largest urban designs put in place. Primera was able to integrate it seamlessly into the building footprint without the need to alter the usable areas, adjacencies, or program functions. Since the building is both a 24-hour facility and a cooling center, several redundancies for systems needed to be included in the design due to the critical nature of the station. This challenge complicated the design process but ultimately increased the reliability of the system.

Solutions

Primera developed an alternative to the original prototype design that included a geothermal system. The heating and cooling for the District 12 station is provided using an 88-well, closed loop geothermal field, which was placed under the adjacent 250-space parking lot. Primera also provided a modular water-to-water heat pump system that could heat and cool simultaneously and ultimately provide excellent redundancy for the facility. This modular system also allowed for the new systems to fit without altering the station design. Lastly, Primera was able to modify the building's central plant while utilizing the same airside system design. The modified design reduced the learning curve for maintenance personnel and end users due to their familiarity with the original system and a need to only learn how to work with the revised plant.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Boiler basics; 2017 Product of the Year winners; Manufacturing facilities Q&A; Building integration; Piping and pumping systems
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me