SEARCH Archives
Loading
Sponsored by:

Standby power systems

The high range gensets from Cummins Power Generation are now preapproved for seismic certification by OSHPD.

08/27/2010


The high range gensets (250 to 2500 kW) from Cummins Power Generation are now preapproved for seismic certification by OSHPD, California’s Office of Statewide Health Planning and Development. Cummins can supply the listed products to healthcare facilities without having to shake-test the actual units being delivered. That means faster installation and commissioning, reducing time and costs.

www.cumminspower.com



No comments

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.