SEARCH Archives
Loading
Sponsored by:

Reports for power testing

11/04/2010


Emerson Network Power has debuted its ASCO PowerQuest Test Reports, which help facilities comply with NFPA, NEC, and JCAHO reporting requirements for on-site power system testing, operation, load profiling, and peak load shaving. ASCO PowerQuest Reports automate the manual, time-consuming data logging required to comply with NFPA 99 and 110 for exercising emergency power systems, NEC 220.87 for documenting actual on-site power demand load, and JCAHO requirements for helping ensure reliable power for life safety loads. The reports’ data format parallels the requirements of reporting codes and standards. The reports include monthly testing, peak load shaving, frequency and test length, date and time of test, equivalent loads (load banks), load run/banks for diesel-powered emergency power systems only, and cold starts.



No comments

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.