Carl R. Darnall Army Medical Center May update

Hospital level 2 is partially ready for furniture move-in. Hospital level 3 punch is underway.

By Southland Industries May 11, 2015

May 2015 update:

  • Hospital level 2 is partially turned over for owner furniture move-in.
  • Continuing hospital test-adjust-balance (TAB) for the bed tower (HL4-7).
  • Hospital level 3 punch is underway.
  • Continuing BSL3 point-to-point verification.
  • TAB of operating rooms is underway.
  • Interstitial Building System (IBS) floor punch is underway.