2008 ARC Awards judge's score sheet
Give each section of the entry points depending on how well the tactics were implemented, based on the information provided. If you think the question was not answered at all (in other words, avoided)—or if the building failed to include certain criteria of the ARC Awards, please give the section a ranking of “1 point.” Building systems (20 pts)Rate the solutions to the challenges posed by the building’s architectural design and site (__/10)
Rate the building’s MEP design for innovation (__/10)
Technology (16 pts)
Rate the use of new or unusual technologies in the following categories:
- Building controls and automation (__/2)
- Electrical distribution (__/2)
- Fire protection (__/2)
- HVAC (__/2)
- Lighting controls (__/2)
- Motors and Drives (__/2)
- Plumbing (__/2)
- Software (__/2)
Sustainability design and documentation (40 pts)
Rate the building’s energy efficiency (__/5 design) (__/5 documentation)Rate the building’s IAQ system (__/5 design) (__/5 documentation)
Rate the building’s water conservation (__/5 design) (__/5 documentation)
Rate the building’s renewable energy(__/5 design) (__/5 documentation)
Integration (10 pts)
What examples of interdisciplinary integration, for example, online collaboration, BIM, etc., did the project offer? (__/5)
Do the photos show the building’s exterior and interior? (__/2)
Do the photos show:
- Building controls and automation (__/2)
- Electrical distribution (__/2)
- Fire protection (__/2)
- HVAC (__/2)
- Lighting controls (__/2)
- Motors and Drives (__/2)
- Plumbing (__/2)
What is the repeatability factor of the solutions from this project? (__/10) Total Building Systems points __/20 Total Technology points __/16 Total Sustainability points __/40 Total Integration points __/10 Total Photography points __/18 Total Bonus points __/10 Overall points _/114