SEARCH Archives
Loading
Sponsored by:

Tale of the Tape

Project: Southern California Edison General Offices Location: Rosemead, Calif. Program: Renovation and retrofit of 14 key facilities, including general corporate offices. Size: About 1,000,000 square feet Cost: About $50 million M/E/P Consulting Engineer, Architect and Contractor: The Austin Co. Fire/Life-Safety Engineer: Ashland Integrated, Inc.

By Consulting Specifying Engineer Staff

12/01/2000


Project: Southern California Edison General Offices

Location: Rosemead, Calif.

Program: Renovation and retrofit of 14 key facilities, including general corporate offices.

Size: About 1,000,000 square feet

Cost: About $50 million

M/E/P Consulting Engineer, Architect and Contractor: The Austin Co.

Fire/Life-Safety Engineer: Ashland Integrated, Inc.

Controls/Automation Engineer: Consolidated Data Systems

Furniture Systems: Herman Miller





No comments

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.