Webcast: Grid-connected PV systems: codes, standards, and specifications

September 09, 2010

Exam for Continuing Education Units

 

1.0  learning units (0.1  CEUs)

 

Speakers: Tom Glavinich, Michael King, Pat Dolan

 

You must get 8 of 10 questions correct to pass the exam. You may retake the exam if necessary. You will be notified whether you passed or failed automatically after taking the exam. Upon passing the exam, a hardcopy certificate will be mailed within 30 days to you at the address you provide below.

 

 

CEU Exam: 9/09/2010 Webcast


Name *
Title *
Company *
Street Address *
City *
State *
Zip *
Email *
Phone Number

separate with hyphens

1.) According to Tom Glavinich-- *

The PV market is being driven by:

2.) According to Tom Glavinich-- *

NEC Section 690.2 defines “interactive PV systems” as being tied to the grid.

3.) According to Tom Glavinich-- *

NEC Section 690.2  specifies that an energy storage subsystem of a solar photovoltaic system, such as a battery, is not another electrical production source.

4.) According to Tom Glavinich-- *

NEC Section 690.2 specifies PV panel nameplates must have:

5.) According to Tom Glavinich-- *

Balance of  System (BOS requirements DO NOT include which component of a PV system:

6.) According to Michael King-- *

MasterSpec’s master guide specification system consists of the master specification sections (text) plus which supporting documents:

7.) According to Michael King-- *

MasterSpec and MasterFormat are the same thing

8.) According to Pat Dolan-- *

The MasterSpec section for PV Energy Systems covers:

9.) According to Pat Dolan-- *

The MasterSpec PV section does not cover junction boxes on modules:

10.) According to Pat Dolan-- *

The MasterSpec PV section covers which types of inverter controllers: