When is "stretching" a holiday permissible?

The test of reasonableness must be applied to every rule and policy any time a question or dispute arises in connection with its enforcement.

02/01/1998


The test of reasonableness must be applied to every rule and policy any time a question or dispute arises in connection with its enforcement.

In a New Jersey plant, a rule as spelled out in the employee manual stated: To be eligible for holiday pay, employees must work a full day before and after the holiday.

When Maintenance Department Painter George Arlan received his check on the payday following the Washington's birthday holiday, he made a quick trip to his supervisor's desk. "I wasn't paid for Washington's birthday," he complained.

Maintenance Foreman Bill Stoller checked the record and replied, "You weren't paid because you were in violation of the contract."

"What violation?"

"Check the manual," Stoller replied, "the rule says..."

He read off the rule as stated.

"You gotta be kidding," Arlan said. "I worked the day before."

"Yeah, 7 1/2 hr instead of 8. That's not a full day."

"Big deal. I took off a 30 min early to catch a train."

Stoller shrugged. "A rule is a rule."

"Not if its application is picayune and ridiculous."

"You may have a point. I'll check it out with the boss."

Question : What do you think? Should Arlan be paid for the holiday?

Parker's verdict: Stoller's boss, Plant Engineer Al Parker, thought so. "The rule's purpose is to discourage holiday stretching. There's a definite distinction between stretching a holiday, and making a practical adjustment. Notify Payroll to pay Arlan for the day."





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 Under 40; Stand-alone medical buildings; NFPA 92; Specialty fire suppression; Applying 90.1 in lighting design
2016 Product of the Year Finalists: Vote now; Data center Q&A; LED codes; Smart buildings
Fire pump power system design: How to design safe, reliable fire pump power service; Water management in commercial buildings; Emergency egress, illumination
Designing generator systems; Using online commissioning tools; Selective coordination best practices
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me